MEC09-02009
| Rough-in | 9/2/2009 | 9/3/2009 | 9/3/2009 4:22:22 PM | P | PART |
|
|
Would like a late afternoon inspection. Thank you...Please call with any questions or concerns. Phone #: ###-#### Internet Inspection Request from: Jennifer Roy 20# test ok will inspect ri in the am
|
MEC09-02008
| Rough-in | 9/2/2009 | 9/3/2009 | 9/3/2009 4:20:52 PM | P | PASS |
|
|
Would like a late afternoon inspection. Thank you...Please call with any questions or concerns Phone #: ###-#### Internet Inspection Request from: Jennifer Roy ri 20# test ok
|
MEC09-01963
| Final | 9/3/2009 | 9/3/2009 | 9/3/2009 2:30:16 PM | P | PASS |
|
|
please complete final inspection Phone #: ###-#### Internet Inspection Request from: Alana Lane final ok with duct in garage ceilings insulation secured.
|
MEC09-01995
| Final | 9/1/2009 | 9/3/2009 | 9/3/2009 2:09:28 PM | P | PASS |
|
|
Joan will leave the back door of garage open if she needs to leave. Phone #: ###-#### Internet Inspection Request from: Yolanda Morris
|
MEC09-02017
| Pressure Test | 9/1/2009 | 9/3/2009 | 9/3/2009 1:55:42 PM | P | PASS |
|
|
We are throwing a pressure on this. Should be done around 11:00 or so. Please call Miguel when you are headed out. ###-#### Thank you! Phone #: ###-#### Internet Inspection Request from: Veronica Shipley 20# test ok
|
MEC09-02015
| Final | 9/3/2009 | 9/3/2009 | 9/3/2009 1:40:55 PM | P | PASS |
|
|
INSTALLER JAROD ###-#### Phone #: ###-#### Internet Inspection Request from: Veronica Shipley
|
MEC09-02045
| Final | 9/2/2009 | 9/3/2009 | 9/3/2009 1:23:36 PM | A | PASS |
|
|
Pressure test only as late in the morning as possible. Call with any problems. Thanks, April. Phone #: ###-#### Internet Inspection Request from: April Sims 20# test ok
|
MEC09-02041
| Final | 9/2/2009 | 9/3/2009 | 9/3/2009 10:51:58 AM | A | PASS |
|
|
Antonio R is the field contact. Be sure to call him ahead of time so that he can get you in the bldg. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
|