ESC07-00660
| Aging Inspection | 9/3/2009 | 9/3/2009 | 9/8/2009 8:14:52 AM | | DONE |
|
|
looks ok, see site final
|
ESC09-00504
| General Inspection | 9/3/2009 | 9/3/2009 | 9/4/2009 8:03:08 AM | P | PART |
|
|
lots of daily activity, 450 checking on
|
ELE09-01211
| Final | 9/2/2009 | 9/3/2009 | 9/3/2009 4:00:15 PM | P | PASS |
|
|
Please Provide final inspection. Phone #: ###-#### Internet Inspection Request from: Spencer Mclean ok to final, signed occupancy card
|
ELE09-01212
| Final | 9/2/2009 | 9/3/2009 | 9/3/2009 3:44:23 PM | P | PASS |
|
|
Please provide final inspection. Phone #: ###-#### Internet Inspection Request from: Spencer Mclean ok to final, signed occupancy card
|
ESC09-00553
| General Inspection | 9/3/2009 | 9/3/2009 | 9/3/2009 3:26:41 PM | P | NR |
|
|
no sign, no work, too early, electrical t/s only
|
ESC07-01100
| General Inspection | 9/3/2009 | 9/3/2009 | 9/3/2009 3:25:36 PM | P | PASS |
|
|
looked ok
|
ELE09-01504
| Final | 9/3/2009 | 9/3/2009 | 9/3/2009 3:24:51 PM | P | PASS |
|
|
ok to final, no esc this project
|
ESC07-01093
| General Inspection | 9/3/2009 | 9/3/2009 | 9/3/2009 3:23:54 PM | P | PASS |
|
|
looked ok
|
ELE09-01356
| Electrical Rough-In | 9/3/2009 | 9/3/2009 | 9/3/2009 3:18:07 PM | P | PASS |
|
|
Brian Phone #: ###-#### ok to cover walls and ceilings, anop, no esc this project
|
ELE09-01642
| Temporary Service | 9/3/2009 | 9/3/2009 | 9/3/2009 2:39:11 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 9/3/2009 at 10:50:28 AM. Contact: ###-####. corrections made, t/s o/h n ok
|
ELE09-01643
| Rough-In Permanent Service | 9/3/2009 | 9/3/2009 | 9/3/2009 1:52:54 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Brandon Blackham ric ok, p/s u/g n ok
|
ELE09-01631
| Final | 9/3/2009 | 9/3/2009 | 9/3/2009 12:50:06 PM | P | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Todd Sellman called, correction notice 314.28 shall provide minimum 14" pull box above panel, no esc this project
|
ELE09-01504
| Electrical Rough-In | 9/2/2009 | 9/3/2009 | 9/3/2009 10:31:27 AM | A | PASS |
|
|
call Loren and meet at front gate to inspect air cleaner connections in first large building(fab shop). project is actually complete and ready for final. Phone #: ###-#### Internet Inspection Request from: Loren Ramsey met contractor, ric ok, no esc this project
|
ELE09-01649
| Electrical Rough-In | 9/2/2009 | 9/3/2009 | 9/3/2009 10:15:27 AM | A | PASS |
|
|
bryan - please call for access Phone #: ###-#### ric ok, no esc this project
|
ELE09-01482
| Final | 8/31/2009 | 9/3/2009 | 9/3/2009 9:41:39 AM | A | NH |
|
|
Internet Inspection Request from: Daryl DeGrange called contractor, people supposed to be there not there, fee due, no esc this project
|
ELE09-01373
| Electrical Rough-In | 9/2/2009 | 9/3/2009 | 9/3/2009 9:02:52 AM | A | FAIL |
|
|
i need a ceiling cover inspection thanks Phone #: ###-#### Internet Inspection Request from: Don Lustig n called contractor, left correction notice to owner,NEC 725.25 abandoned cl 2,3, and pltc cables shall be removed,300.11 cables shall not be supported by ceiling grids or tiles, no esc this project
|
ELE09-01492
| Electrical Rough-In | 9/2/2009 | 9/3/2009 | 9/3/2009 8:02:27 AM | A | PASS |
|
|
Jim is the contact his no. is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates ric up and down ok, no esc this project
|