FIR09-00349
| FIR-Aging Inspection | 9/3/2009 | 9/3/2009 | 9/4/2009 9:07:54 AM | | NR |
|
|
Work is in progress
|
FIR09-00495
| INSP-Final Inspection | 9/3/2009 | 9/3/2009 | 9/3/2009 2:15:57 PM | P | PASS |
|
|
The sprinkler piping is ok to cover but prior to final the insulation at deck, located above the water heater, needs to be re-attached to the deck since it is obstructing the existing upright sprinklers. This will be checked at the final and Bruce with Commercial Fire was notified.
|
FIR09-00511
| INSP-Final Inspection | 9/2/2009 | 9/3/2009 | 9/3/2009 1:04:13 PM | P | FAIL |
|
|
I left a message with the fire alarm contractor at 12:30 that I was headed towards the project site for the inspection. I left at 1:00 after no contact other than the store manager. No inspection was performed.
|
FIR09-00483
| INSP-Final Inspection | 9/2/2009 | 9/3/2009 | 9/3/2009 12:36:06 PM | A | PASS |
|
|
permit finaled
|
BLD09-01340
| FIRE-Final Inspection | 9/2/2009 | 9/3/2009 | 9/3/2009 11:28:29 AM | A | PASS |
|
|
life safety passed
|
FIR09-00229
| INSP-Final Inspection | 9/2/2009 | 9/3/2009 | 9/3/2009 10:54:03 AM | A | PASS |
|
|
Permit finaled. Netcom showed 0.
|
FIR07-01032
| INSP-Sprinkler Rough-in | 9/2/2009 | 9/3/2009 | 9/3/2009 10:53:32 AM | A | PASS |
|
|
Sprinkler piping in the residence rooms as marked on the city approved plans is ok to cover.
|
FIR09-00506
| INSP-Final Inspection | 9/2/2009 | 9/3/2009 | 9/3/2009 10:52:56 AM | A | PASS |
|
|
Permit finaled. EOL voltage verified.
|
FIR08-00830
| INSP-Sprinkler Rough-in/Hydro | 9/2/2009 | 9/3/2009 | 9/3/2009 10:52:24 AM | A | PART |
|
|
The first floor dry system and the two second floor wet systems passed the overhead hydro tests. The others failed.
|
BLD09-00835
| FIRE-Final Inspection | 9/3/2009 | 9/3/2009 | 9/3/2009 12:00:00 AM | P | CANC |
|
|
Ken Phone #: ###-####
|