Inspections for the day of: Thursday, September 3, 2009.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00349 FIR-Aging Inspection9/3/20099/3/20099/4/2009 9:07:54 AM NR
Work is in progress
FIR09-00495 INSP-Final Inspection9/3/20099/3/20099/3/2009 2:15:57 PMPPASS
The sprinkler piping is ok to cover but prior to final the insulation at deck, located above the water heater, needs to be re-attached to the deck since it is obstructing the existing upright sprinklers. This will be checked at the final and Bruce with Commercial Fire was notified.
FIR09-00511 INSP-Final Inspection9/2/20099/3/20099/3/2009 1:04:13 PMPFAIL
I left a message with the fire alarm contractor at 12:30 that I was headed towards the project site for the inspection. I left at 1:00 after no contact other than the store manager. No inspection was performed.
FIR09-00483 INSP-Final Inspection9/2/20099/3/20099/3/2009 12:36:06 PMAPASS
permit finaled
BLD09-01340 FIRE-Final Inspection9/2/20099/3/20099/3/2009 11:28:29 AMAPASS
life safety passed
FIR09-00229 INSP-Final Inspection9/2/20099/3/20099/3/2009 10:54:03 AMAPASS
Permit finaled. Netcom showed 0.
FIR07-01032 INSP-Sprinkler Rough-in9/2/20099/3/20099/3/2009 10:53:32 AMAPASS
Sprinkler piping in the residence rooms as marked on the city approved plans is ok to cover.
FIR09-00506 INSP-Final Inspection9/2/20099/3/20099/3/2009 10:52:56 AMAPASS
Permit finaled. EOL voltage verified.
FIR08-00830 INSP-Sprinkler Rough-in/Hydro9/2/20099/3/20099/3/2009 10:52:24 AMAPART
The first floor dry system and the two second floor wet systems passed the overhead hydro tests. The others failed.
BLD09-00835 FIRE-Final Inspection9/3/20099/3/20099/3/2009 12:00:00 AMPCANC
Ken Phone #: ###-####