MEC09-01703
| Final | 9/3/2009 | 9/3/2009 | 9/3/2009 4:07:23 PM | P | PASS |
|
|
please complete a final inspection on the range hood Phone #: ###-#### Internet Inspection Request from: Alana Lane
|
MEC09-02047
| Pressure Test | 9/3/2009 | 9/3/2009 | 9/3/2009 3:27:57 PM | P | PASS |
|
|
Phone #: ###-#### x123 Internet Inspection Request from: Michele LaMott
|
MEC09-02047
| Rough-in | 9/3/2009 | 9/3/2009 | 9/3/2009 3:27:25 PM | P | PASS |
|
|
Phone #: ###-#### x123 Internet Inspection Request from: Michele LaMott
|
MEC09-01821
| Final | 9/3/2009 | 9/3/2009 | 9/3/2009 3:02:51 PM | P | PASS |
|
|
112-119 BLDNG 2 are ready. Phone #: ###-#### Internet Inspection Request from: April Sims
|
MEC09-02046
| Rough-in | 9/3/2009 | 9/3/2009 | 9/3/2009 2:15:28 PM | P | FAIL |
|
|
Internet Inspection Request from: Veronica Shipley c/n posted
|
GCM09-00008
| GCM-Final | 9/3/2009 | 9/3/2009 | 9/3/2009 2:15:09 PM | P | PASS |
|
|
brent - ###-####
|
MIS09-00165
| MEC-Conference | 9/2/2009 | 9/3/2009 | 9/3/2009 11:10:09 AM | A | PASS |
|
|
Billy Phone #: ###-####- someone there after 10am
|
MIS09-00165
| MEC-Final | 9/3/2009 | 9/3/2009 | 9/3/2009 11:09:55 AM | A | PASS |
|
|
Billy Phone #: ###-####- someone there after 10am
|
MEC09-02044
| Rough-in | 9/2/2009 | 9/3/2009 | 9/3/2009 10:52:05 AM | A | PASS |
|
|
Dan Phone #: ###-####
|
MEC09-02044
| DOC - Permit Finaled | 9/3/2009 | 9/3/2009 | 9/3/2009 10:51:45 AM | P | PASS |
|
|
|
MEC09-02044
| Pressure Test | 9/2/2009 | 9/3/2009 | 9/3/2009 10:50:57 AM | A | PASS |
|
|
Dan Phone #: ###-####
|
ESC09-00548
| Site Preparation | 9/3/2009 | 9/3/2009 | 9/3/2009 9:29:23 AM | | FAIL |
|
|
talked to bond about having bmps in place by end of day, will schedule reinspect for 9/4/09
|
MEC09-00900
| Rough-in | 9/3/2009 | 9/3/2009 | 9/3/2009 9:08:52 AM | A | PASS |
|
|
pressure test-supply/return radiant lines, for o.k. to sheetrock. Please call 15 min. ahead. Phone #: ###-#### Internet Inspection Request from: Pat Falls ok hydronics test from boiler location to manifolds
|