Inspections for the day of: Friday, September 3, 2010.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD10-00777 FIRE-Final Inspection9/3/20109/3/20109/3/2010 4:06:18 PMPFAIL
Provide single action hardware and a fire extinguisher as discussed.
BLD09-00946 FIRE-Final Inspection9/2/20109/3/20109/3/2010 3:31:29 PMACANC
Need the project related fire alarm permit signed off.
BLD09-00945 FIRE-Final Inspection9/1/20109/3/20109/3/2010 3:31:03 PMACANC
Need the project related fire alarm permit signed off.
FIR10-00225 INSP-Sprinkler Rough-in/Hydro9/1/20109/3/20109/3/2010 3:30:08 PMAFAIL
Provide approved map with all required information and mount at the facp.
FIR10-00013 INSP-Final Inspection9/1/20109/3/20109/3/2010 3:29:13 PMAFAIL
Provide approved map with all required information and mount at the facp.
FIR09-00635 INSP-Final Inspection9/1/20109/3/20109/3/2010 3:28:37 PMAFAIL
Provide approved map with all required information and mount at the facp.
BLD10-01955 FIRE-Final Inspection9/1/20109/3/20109/3/2010 1:19:34 PMPPASS
Life safety passed
BLD10-01993 FIRE-Final Inspection9/3/20109/3/20109/3/2010 11:32:09 AMPPASS
Life safety passed
FIR10-00166 INSP-Final Inspection9/3/20109/3/20109/3/2010 11:31:33 AMPPASS
Permit finaled
BLD10-01273 FIRE-Final Inspection9/3/20109/3/20109/3/2010 11:30:37 AMPPASS
Life safety passed
FIR10-00166 INSP-Alarm Testing9/2/20109/3/20109/3/2010 11:28:19 AMAPASS
Permit finaled
BLD10-01103 FIRE-Final Inspection9/2/20109/3/20109/3/2010 11:02:37 AMAPASS
Life safety passed. The smoke evac system had to be repaired while I was on site.
FIR10-00427 INSP-Final Inspection9/2/20109/3/20109/3/2010 11:01:28 AMAPASS
Permit finaled