BLD14-02127
| BLD-Conference | 9/3/2014 | 9/3/2014 | 9/4/2014 11:08:59 AM | P | DONE |
|
|
Mike Phone #: ###-####
|
MIS14-00096
| BLD-Final | 9/3/2014 | 9/3/2014 | 9/3/2014 9:02:42 PM | P | NR |
|
|
Obtain Erosion control final.......then call for final on mis permit.
|
BLD14-01143
| BLD-Framing/Rough-in | 9/3/2014 | 9/3/2014 | 9/3/2014 2:58:02 PM | P | PASS |
|
|
Hey Jim, can you give me a call when your heading over there to do the inspection. I would like to meet you there.....Robert - ###-####. Phone #: ###-#### Inspection requested via web by robert campbell
|
MIS13-00164
| BLD-Final | 9/3/2014 | 9/3/2014 | 9/3/2014 1:43:38 PM | P | CANC |
|
|
Defer to Electr.....
|
BLD12-01449
| BLD-Final | 9/2/2014 | 9/3/2014 | 9/3/2014 11:50:20 AM | A | NR |
|
|
Dan Lancaster Phone #: ###-#### All framing OK except interior (North) shear wall nailing.
|
BLD14-02128
| BLD-Wall Bracing | 9/2/2014 | 9/3/2014 | 9/3/2014 11:48:40 AM | A | PASS |
|
|
Mark Phone #: ###-####
|
ESC14-00757
| Site Preparation | 9/2/2014 | 9/3/2014 | 9/3/2014 11:48:20 AM | A | PASS |
|
|
|
BLD14-02259
| BLD-Footing | 9/2/2014 | 9/3/2014 | 9/3/2014 11:48:01 AM | A | PASS |
|
|
Shawn- 11am pour time Phone #: ###-####
|
ESC14-00754
| Site Preparation | 9/2/2014 | 9/3/2014 | 9/3/2014 11:47:35 AM | A | PASS |
|
|
|
BLD14-02258
| BLD-Footing | 9/2/2014 | 9/3/2014 | 9/3/2014 11:47:15 AM | A | PASS |
|
|
Shawn- 11am pour time Phone #: ###-####
|
BLD14-02009
| BLD-Final | 9/2/2014 | 9/3/2014 | 9/3/2014 11:46:53 AM | A | NR |
|
|
call to meet -- David Phone #: ###-#### Need Electr and Mech finals.
|