BLD13-03291
| BLD-Framing/Rough-in | 9/2/2014 | 9/3/2014 | 9/4/2014 7:29:57 AM | A | PART |
|
|
MJ Phone #: ###-#### ok to insulate framing west stair tower
|
BLD14-02424
| BLD-Final | 9/3/2014 | 9/3/2014 | 9/4/2014 7:28:53 AM | P | CANC |
|
|
Emina Phone #: ###-####
|
BLD14-01907
| BLD-Final | 9/2/2014 | 9/3/2014 | 9/4/2014 7:27:02 AM | P | PART |
|
|
Doug Phone #: ###-#### ok for temp occ ok for perm occ after elec is finaled
|
BLD14-02000
| BLD-Final | 9/3/2014 | 9/3/2014 | 9/4/2014 7:25:12 AM | P | NR |
|
|
Phone #: 8415809 >> Inspection requested via mobile web by Mike
|
MIS14-00208
| BLD-Conference | 9/3/2014 | 9/3/2014 | 9/3/2014 4:00:09 PM | P | FAIL |
|
|
report of a reroof with no permi stop work issued no one on site. double fee
|
BLD14-01535
| BLD-Footing | 9/2/2014 | 9/3/2014 | 9/3/2014 12:14:12 PM | A | PASS |
|
|
Jason Phone #: ###-####
|
GCB14-00080
| GCB-Footing | 9/2/2014 | 9/3/2014 | 9/3/2014 11:15:52 AM | A | PASS |
|
|
Ryan ###-#### wants to pour in the late AM
|
GCB14-00079
| GCB-Footing | 9/2/2014 | 9/3/2014 | 9/3/2014 11:14:21 AM | A | PASS |
|
|
Ryan ###-#### want to pour late AM
|