ESC13-00355
| General Inspection | 9/2/2014 | 9/3/2014 | 9/3/2014 12:32:17 PM | P | PASS |
|
|
WIP. Yard not yet landscaped and some construction remains. No activity or violations observed at time of inspection.
|
ESC14-00030
| Aging Inspection | 9/3/2014 | 9/3/2014 | 9/3/2014 11:57:16 AM | | PASS |
|
|
Finaled.
|
ESC14-00030
| DOC - Permit Finaled | 9/3/2014 | 9/3/2014 | 9/3/2014 11:54:05 AM | P | PASS |
|
|
Accessory structure is complete. Site has been cleaned and stabilized. BLD finaled. ESC conditions met.
|
ESC14-00001
| Aging Inspection | 9/3/2014 | 9/3/2014 | 9/3/2014 11:48:42 AM | | PASS |
|
|
Finaled.
|
ESC14-00001
| DOC - Permit Finaled | 9/3/2014 | 9/3/2014 | 9/3/2014 11:48:32 AM | P | PASS |
|
|
CBH project in Trailside Place II is complete. DI bags were recently maintained for remaining homesites to be developed.
All permits finaled. ESC conditions satisfied.
|
ESC13-00755
| Tracking Control | 9/3/2014 | 9/3/2014 | 9/3/2014 11:45:45 AM | P | FAIL |
|
|
Correction Notice:
1. Sweep Council Springs at west construction entrance as well as the first block Warm Springs to the west of Council Springs. 2. Sweep Lysted and install gravel bag where the pavement is not patched to collect loose sediment and rocks.
VM left to JC of Petra. Will follow up. Requested to complete by end of day 9/4.
|
ESC14-00733
| Site Preparation | 9/3/2014 | 9/3/2014 | 9/3/2014 11:31:59 AM | P | PASS |
|
|
inspection so we can begin construction. Thanks Phone #: ###-#### >> Inspection requested via web by Joshua Edwards
Permit is posted. RH#5 BMPs in good condition with greater than 50% capcity in neighborhood washout. Current projects by Brighton are being well kept. Site is ready for excavation.
|
ESC13-01024
| Site Preparation | 9/3/2014 | 9/3/2014 | 9/3/2014 11:24:02 AM | P | PASS |
|
|
Clint Phone #: ###-####
Permit posted. Concrete washout for area provided. Numerous projects in progress on block. Regular housekeeping will be necessary. Approved for excavation.
|
ESC13-01252
| Aging Inspection | 9/3/2014 | 9/3/2014 | 9/3/2014 11:21:22 AM | | PASS |
|
|
Finaled.
|
ESC13-01252
| DOC - Permit Finaled | 9/3/2014 | 9/3/2014 | 9/3/2014 11:21:08 AM | P | PASS |
|
|
SFH construction complete. Home is landscaped and stabilized. All permits finaled. ESC conditions satisfied.
|
ESC14-00075
| DOC - Permit Finaled | 9/3/2014 | 9/3/2014 | 9/3/2014 11:12:51 AM | A | PASS |
|
|
Geothermal project at the Natatorium is complete. Materials have been removed, access road has been swept, and no undisturbed earth remains. No further ESC inspections necessary, permit conditions met.
|
ESC13-01108
| Aging Inspection | 9/3/2014 | 9/3/2014 | 9/3/2014 11:07:53 AM | | PASS |
|
|
Finaled.
|
ESC13-01108
| DOC - Permit Finaled | 9/3/2014 | 9/3/2014 | 9/3/2014 11:07:42 AM | P | PASS |
|
|
Home is complete, occupied, landscaped and ESC permit conditions satisfied.
|
ESC14-00462
| Random Inspection | 9/3/2014 | 9/3/2014 | 9/3/2014 11:01:33 AM | A | PASS |
|
|
Security fencing and perimeter wattles are containing activity and sediment. No significant trackout or sedimentation in gutters. Rear vegetated hillside has been preserved. Approved.
|
ESC14-00246
| General Inspection | 9/3/2014 | 9/3/2014 | 9/3/2014 11:00:11 AM | | PASS |
|
|
Area around pool is not yet landscaped/stabilized. No sediment leaving site. WIP. Permit posted. No corrections at this time.
|
ESC13-00193
| Random Inspection | 9/3/2014 | 9/3/2014 | 9/3/2014 10:40:32 AM | A | PASS |
|
|
Corrections on Somerset Village #3 have been completed. Additional wattles were installed on upper side of culdesac, the DI bags and gutters were cleaned/maintained. No new corrections necessary. Site is in compliance.
|
ESC14-00043
| General Inspection | 9/2/2014 | 9/3/2014 | 9/3/2014 10:31:07 AM | P | PASS |
|
|
Finaled.
|
ESC14-00043
| DOC - Permit Finaled | 9/3/2014 | 9/3/2014 | 9/3/2014 10:30:53 AM | P | PASS |
|
|
Home construction is complete and yard is landscaped. ESC conditions satisfied. Downstream BMPs are to remain installed for other homes currently under construction in Somerset Ridge #5.
|
ESC13-00524
| Random Inspection | 9/3/2014 | 9/3/2014 | 9/3/2014 10:22:19 AM | A | PASS |
|
|
Hillside gullies have been repaired and roads, gutters, and DI bags have been maintained to remove accumulated sediment. No new issues or areas of concern at this time. Need to continue to monitor check dams in the drainage below the site.
|
ESC13-01158
| Aging Inspection | 9/3/2014 | 9/3/2014 | 9/3/2014 10:19:15 AM | | PASS |
|
|
Work on rear garage is in progress. Permit posted in the alley. No corrections required.
|
ESC14-00266
| General Inspection | 9/3/2014 | 9/3/2014 | 9/3/2014 10:15:08 AM | | PASS |
|
|
WIP. Permit is posted and hillside BMPs installed. No sediment runoff or other violations observed. Paso Fino street looks good.
|
ESC14-00650
| Site Preparation | 9/2/2014 | 9/3/2014 | 9/3/2014 10:09:51 AM | A | PASS |
|
|
call ahead to meet - Charlie Phone #: ###-####
Existing vegetation and retaining walls are already in place. Wattles have been installed at the pad of the house. Driveway is already paved.
There will be some trenching in the culdesac so some stockpile controls may be necessary. Permit is posted and Charlie has plans to manage construction waste to maximize recycling and proper disposal.
|