FIR14-00751
| INSP-Sprinkler Rough-in/Hydro | 9/2/2015 | 9/3/2015 | 9/3/2015 11:31:45 AM | A | PASS |
|
|
Hydrostatic test (200 psi @ 2hours) for the wet pipe system for Bldg. L. Some hard-lid areas of the wet system have already been covered, although contractor has stated that these areas were inspected prior to this inspection. No inspection of these areas were recorded on the plans, which is the typical process. Hydrotest PASSED
|
FIR14-00751
| INSP-Sprinkler Rough-in | 9/2/2015 | 9/3/2015 | 9/3/2015 11:31:26 AM | A | PART |
|
|
Rough to cover inspection for wet pipe hard lids - some CPVC pipe already covered - contractor stated that was inspected at an earlier inspection, although this was not indicated on the plans. Wet system under hydrotest also during this inspection.
|
FIR14-00477
| INSP-Final Inspection | 9/2/2015 | 9/3/2015 | 9/3/2015 10:14:19 AM | A | PASS |
|
|
Final inspection of the fire service U/G supply to the building - PASSED. Contractor cert. of completion signed off and will be emailed to the PDS office.
|
FIR14-00603
| INSP-Final Inspection | 9/2/2015 | 9/3/2015 | 9/3/2015 10:13:07 AM | A | PASS |
|
|
Final inspection of fire sprinklers for the parking garage area of the building - PASSED. Contractor cert. of completion signed off and will be emailed to the PDS office.
|
FIR14-00815
| INSP-Final Inspection | 9/2/2015 | 9/3/2015 | 9/3/2015 10:11:48 AM | A | PASS |
|
|
Final inspection of fire sprinklers for the above parking lot areas of the building - PASSED. Contractor cert. of completion signed off and will be emailed to the PDS office.
|
FIR14-00478
| INSP-Final Inspection | 9/2/2015 | 9/3/2015 | 9/3/2015 10:07:06 AM | A | PASS |
|
|
Final inspection of fire service U/G supply. PASSED NOTE: Heat tracing of wet pipe bulk mains running through parking garage has been determined not to be required.
|