Inspections for the day of: Thursday, September 3, 2015.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00809 Tracking Control9/2/20159/3/20159/3/2015 4:17:54 PMAPEND
Hard Rock construction working on sewer and water tap in, which is why no construction entrance. RP had crew sweep up dirt that had tracked out to Starview. Will return to assess other sediment controls needed once sewer/utility work is complete.
ESC15-00023 General Inspection9/3/20159/3/20159/3/2015 3:43:41 PM PASS
No activity at time of inspection. Wattle is installed along toe of slope and edge of pavement. Sidewalk and gutter are relatively clean and have been periodically swept. DI bag installed. No correcitons issued at this time, correction to haul away trash prior inspection was completed.
ESC15-00024 BMP Violation9/1/20159/3/20159/3/2015 3:29:59 PMPPASS
2 PM follow-up inspection for BMP violation issued 9/1

RP & home builder onsite for re-inspection.

Stockpiles along front of house and sidewalk were pushed back and the fiber wattle was re-installed along the toe of the slope that is the parcel frontage. Sidewalk and gutter was swept as requested. Drop inlet that receives runoff has sediment filter sack installed and is about 50% full. Requested that RP empty it out this week or next.

Site is back in compliance, corrections made. Approved.
ESC15-00667 General Inspection9/3/20159/3/20159/3/2015 11:36:42 AMPPASS
WIP on Warm Springs by-pass. Silt fence BMP is installed properly around irrigation ditch and drainage culvert. No significant trackout to Wise or Warm Springs near Old Eckert Road. No corrections issued. Some wind blown dust occuring in the windy conditions. Area south of fire station should be stabilized if grading is complete. Will discuss with contractor next week to see what the schedule is.
ESC15-00035 General Inspection9/3/20159/3/20159/3/2015 11:09:33 AM PASS
Work complete. DI bags installed on new stormwater drains, temporary sediment controls installed around areas that have been revegetated and hydroseeded. All other construction materials and equipment has been removed. WIP on Warm Springs by-pass round at south exit of the new roundabout and covered under ESC15-00667
ESC14-00989 General Inspection9/3/20159/3/20159/3/2015 10:59:03 AM PART
WIP on foundation. No trackout or discharges. Lined concrete washout box was used for recent concrete work. Trash is contained and seperated.

1 correction:

Install sedimet control BMP/inlet protection on the circular storm drain on the southeast corner of parcel.

- verbal correction issued to RP
ESC14-00597 Aging Inspection9/3/20159/3/20159/3/2015 10:18:08 AM PASS
WIP on The District. No trackout to Parkcenter. Perimeter controls are installed and fugitive dust control. No turbid discharge from irrigation diversion. See ESC14-00588 for main site ESC permit inspections. Approved. Note: 14 seperate ESC permits for individual structures.
ESC14-00596 Aging Inspection9/3/20159/3/20159/3/2015 10:17:33 AM PASS
WIP on The District. No trackout to Parkcenter. Perimeter controls are installed and fugitive dust control. No turbid discharge from irrigation diversion. See ESC14-00588 for main site ESC permit inspections. Approved. Note: 14 seperate ESC permits for individual structures.
ESC14-00595 Aging Inspection9/3/20159/3/20159/3/2015 10:17:17 AM PASS
WIP on The District. No trackout to Parkcenter. Perimeter controls are installed and fugitive dust control. No turbid discharge from irrigation diversion. See ESC14-00588 for main site ESC permit inspections. Approved. Note: 14 seperate ESC permits for individual structures.
ESC14-00594 Aging Inspection9/3/20159/3/20159/3/2015 10:17:03 AM PASS
WIP on The District. No trackout to Parkcenter. Perimeter controls are installed and fugitive dust control. No turbid discharge from irrigation diversion. See ESC14-00588 for main site ESC permit inspections. Approved. Note: 14 seperate ESC permits for individual structures.
ESC14-00593 Aging Inspection9/3/20159/3/20159/3/2015 10:16:46 AM PASS
WIP on The District. No trackout to Parkcenter. Perimeter controls are installed and fugitive dust control. No turbid discharge from irrigation diversion. See ESC14-00588 for main site ESC permit inspections. Approved. Note: 14 seperate ESC permits for individual structures.
ESC15-00078 General Inspection9/3/20159/3/20159/3/2015 8:54:05 AM PASS
WIP at Ashville Commons. No trackout. Access drive to units and parking has been paved and curbed. Foundations and framing have started. No corrections needed at this time.
ESC15-00077 General Inspection9/3/20159/3/20159/3/2015 8:52:44 AM PASS