MIS19-00253
| BLD-Conference | 8/23/2019 | 8/27/2019 | | P | |
|
|
status review
|
BLD19-02125
| BLD-Conference | 8/30/2019 | 9/3/2019 | 9/4/2019 11:13:45 AM | A | PEND |
|
|
email complaint: "The house across the alley from me is being rehabbed - up on girders, basement being dug. I wanted to express my concerns about how close the work vehicles are coming to our house. Our house is located at 511 Sherman Street and sits very close to the alley across from the rehab project. Is there a way to require the machinery to stay on their property? Last night I found that a large (over 6 ft tall) pile of dirt had spilled into the alley last night, which means that today''s trash/recycle trucks will be veering even closer to our house. And there have been heavy tire tracks right next to our front porch. It there any way for the City to require them to access the property from a spot that is less threatening to the neighbors'' properties? Thank you for your help. p.s. Are they not required to have any sort of erosion control BMPs? " Phone #: ###-####/// talked with excavator person,, went over issues,, told to clean up and get bmp's in place,, called RP,, left v.mail same,, he called back and said he would take care of it,, ESC personnel will follow up
|
BLD19-00785
| BLD-Foundation | 9/3/2019 | 9/3/2019 | 9/3/2019 5:19:28 PM | P | DONE |
|
|
Bill Phone #: ###-####
|
BLD19-00045
| BLD-Final | 9/3/2019 | 9/3/2019 | 9/3/2019 4:49:00 PM | P | FAIL |
|
|
Dillon Phone #: ###-####,, needs window fall protection
|
BLD19-00045
| BLD-Blower Door Test Results | 9/3/2019 | 9/3/2019 | 9/3/2019 4:48:37 PM | P | DONE |
|
|
Dillon Phone #: ###-####,, 3.08
|
BLD19-02587
| BLD-Footing | 8/30/2019 | 9/3/2019 | 9/3/2019 4:24:46 PM | A | PART |
|
|
Dion Phone #: ###-####,, new post footings ok
|
BLD19-01523
| BLD-Energy code compliance | 9/3/2019 | 9/3/2019 | 9/3/2019 4:04:50 PM | P | PASS |
|
|
Ron Phone #: ###-####,, rear wall was re-built,, ok now re-insulating the rim area
|
BLD19-01522
| BLD-Energy code compliance | 9/3/2019 | 9/3/2019 | 9/3/2019 4:01:00 PM | P | PASS |
|
|
Ron Phone #: ###-####
|
BLD19-02968
| BLD-Footing | 9/3/2019 | 9/3/2019 | 9/3/2019 3:54:23 PM | P | NR |
|
|
Liza Phone #: ###-####
|
BLD18-02064
| BLD-Energy code compliance | 9/3/2019 | 9/3/2019 | 9/3/2019 2:57:25 PM | P | PASS |
|
|
Mark Phone #: ###-####
|
BLD17-03394
| BLD-Final | 9/3/2019 | 9/3/2019 | 9/3/2019 2:35:41 PM | P | NR |
|
|
Gim Phone #: ###-####
|
BLD19-02468
| BLD-Framing/Rough-in | 9/3/2019 | 9/3/2019 | 9/3/2019 2:34:32 PM | P | DEFR |
|
|
Danny Phone #: ###-####,, needs mech
|
BLD18-04209
| BLD-Foundation | 8/30/2019 | 9/3/2019 | 9/3/2019 11:51:14 AM | A | PART |
|
|
Chris Phone #: ###-####,, work in progress,, appears ok
|
BLD19-02468
| BLD-Framing/Rough-in | 8/30/2019 | 9/3/2019 | 9/3/2019 11:10:10 AM | A | NR |
|
|
Danny Phone #: ###-####,, needs trades passed
|
BLD19-03182
| BLD-Conference | 8/30/2019 | 9/3/2019 | 9/3/2019 11:06:25 AM | A | PART |
|
|
Fernando Phone #: ###-####.. ? about the gutter drain pipe next to the footing.. general look at the job,, ok,, drain pipe not affecting
|
BLD19-02504
| BLD-Final | 8/30/2019 | 9/3/2019 | 9/3/2019 10:50:01 AM | A | PASS |
|
|
Eric Phone #: ###-####
|
BLD19-02504
| DOC - Permit Finaled | 9/3/2019 | 9/3/2019 | 9/3/2019 10:49:40 AM | P | PASS |
|
|
|
BLD19-02654
| BLD-Framing/Rough-in | 8/30/2019 | 9/3/2019 | 9/3/2019 12:00:00 AM | P | CANC |
|
|
Bob Phone #: ###-####
|