MIS99-00094
| BLD-Final | 9/30/1999 | 9/30/1999 | 10/1/1999 12:00:00 AM | P | FAIL |
|
|
HARRY ###-#### FN OCCc/n posted
|
BLD99-02882
| BLD-Framing/Rough-in | 9/29/1999 | 9/30/1999 | 9/30/1999 12:00:00 AM | A | PASS |
|
|
Bob Cafferty, ###-#### ted isabell arch to resubmit to dan stuart plan reviewed 1 hr corridoor
|
BLD99-01838
| BLD-Foundation | 9/29/1999 | 9/30/1999 | 9/30/1999 12:00:00 AM | A | PASS |
|
|
|
BLD99-01704
| BLD-Footing | 9/29/1999 | 9/30/1999 | 9/30/1999 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 09/29/1999 at 15:30:45. Contact: ###-####. SI
|
BLD99-01704
| BLD-Footing | 9/29/1999 | 9/30/1999 | 9/30/1999 12:00:00 AM | A | NR |
|
|
Preston Baked ###-#### SI
|
BLD99-01722
| BLD-Footing | 9/29/1999 | 9/30/1999 | 9/30/1999 12:00:00 AM | A | NR |
|
|
Preston Baker ###-#### SI
|
BLD99-02867
| BLD-Concrete | 9/30/1999 | 9/30/1999 | 9/30/1999 12:00:00 AM | P | PART |
|
|
MIKE--###-#### STEM WALL-WILL POUR AT 3:30 rebar ok pending special ins report. Hold downs bolts not on site check after for arrows.
|
MEC99-02584
| Final | 9/30/1999 | 9/30/1999 | 9/30/1999 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/30/1999 at 09:21:59. Contact: ###-####. No access
|
BLD99-00157
| BLD-Final | 9/30/1999 | 9/30/1999 | 9/30/1999 12:00:00 AM | P | PASS |
|
|
ED-- ###-#### RE-INSP FN l/c u/r3 20 min door installed ok
|
BLD99-01666
| BLD-Framing/Rough-in | 9/30/1999 | 9/30/1999 | 9/30/1999 12:00:00 AM | P | PART |
|
|
ken ###-#### need truss engineering ok to insulate
|
MIS99-00200
| BLD-Conference | 9/28/1999 | 9/30/1999 | 9/30/1999 12:00:00 AM | P | NH |
|
|
Rehab request for housing code. Contact Peggy @ ###-#### if you cannot be there. Unable to access bldg n/h
|
BLD99-02625
| BLD-Final | 9/29/1999 | 9/30/1999 | 9/30/1999 12:00:00 AM | P | FAIL |
|
|
JOAN 30 MINUTE NOTICE ###-#### pend others
|