Inspections for the day of: Monday, September 30, 2002.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJack Frank
TitleELE-INSPECTOR
Phone #794-1930
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE02-02994 Temporary Service9/26/20029/30/20029/30/2002 12:00:00 AMAPASS
steve-###-#### t/p



t/s u/g new ok 9/30/2002 12:20:14 PM
ELE02-02682 Final9/27/20029/30/20029/30/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 09/27/2002 at 15:05:10. Contact: ###-####. cor. posted 110.2, and uniform administrative code section 107 vibrating beds and xray equipment listings 9/30/2002 12:00:24 PM
ELE02-03007 Permanent Service9/27/20029/30/20029/30/2002 12:00:00 AMAFAIL
###-#### called grd rods shall be 6ft apart proper id of phases for high leg and grd electrode taps each shall be under it's own kerney 9/30/2002 10:45:03 AM
ELE02-02685 Electrical Rough-In9/30/20029/30/20029/30/2002 12:00:00 AMPFAIL
ernist ( this is a voice pager # )please page him so he can show you what needs to be inspected; Phone #: ###-#### Internet Inspection Request from: Darla Downs called twice the number is not in service, could not make contact 9/30/2002 6:02:39 PM
ELE02-02288 Electrical Rough-In9/30/20029/30/20029/30/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 09/30/2002 at 08:21:35. Contact: ###-####. hard ceilings
9/30/2002 5:35:27 PM
ELE02-02467 Final9/30/20029/30/20029/30/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/30/2002 at 09:01:25. Contact: ###-####. ok 9/30/2002 2:42:11 PM
ELE02-02779 Temporary Service9/30/20029/30/20029/30/2002 12:00:00 AMPFAIL
pole is on owl ridge ###-#### ernie correction not made shall not ID 6 or smaller neutral met with owner 9/30/2002 2:58:20 PM
ELE02-03010 Electrical Rough-In9/30/20029/30/20029/30/2002 12:00:00 AMPPASS
bill; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung kit. ok 9/30/2002 3:36:28 PM
ELE02-02528 Rough-In Permanent Service9/30/20029/30/20029/30/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 09/30/2002 at 11:05:08. Contact: ###-####. r/i for new addition only, p/s needs to bee calculated for required size, all wiring done without permits, and inspections shall be brought up too current code, no violations too be retained met with contractor at job site 9/30/2002 4:43:23 PM