Inspections for the day of: Monday, September 30, 2002.
Number of inspections: 25
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01853 BLD-Conference9/29/20029/30/200210/4/2002 12:00:00 AMPPART
w/ Mike P...eng'g is rec'd 10/4/2002 3:11:13 PM
BLD01-02750 BLD-Conference9/29/20029/30/200210/2/2002 12:00:00 AMACANC
BLD02-01352 BLD-Conference9/23/20029/30/200210/1/2002 12:00:00 AMAPART
SWO?...need input from Jim Schmer re elc service/ r/i for laundry...left msg. 10/1/2002 2:01:40 PM
BLD02-01735 BLD-Framing/Rough-in9/27/20029/30/20029/30/2002 12:00:00 AMAFAIL
MORIA PLEASE CALL BEFORE ; Phone #: ###-#### Internet Inspection Request from: Darla Downs...c/n re trusses...spqacing at girders, nailing 9/30/2002 12:42:53 PM
MEC02-02771 Rough-in9/27/20029/30/20029/30/2002 12:00:00 AMACANC
r/i randy -###-#### assigned in error 9/30/2002 6:13:17 PM
MEC02-02771 Pressure Test9/27/20029/30/20029/30/2002 12:00:00 AMACANC
###-#### randy
BLD02-01784 BLD-Final9/27/20029/30/20029/30/2002 12:00:00 AMANR
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD02-01783 BLD-Final9/27/20029/30/20029/30/2002 12:00:00 AMANR
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD02-01080 BLD-Final9/27/20029/30/20029/30/2002 12:00:00 AMAPASS
MIKE; Phone #: ###-#### Internet Inspection Request from: Darla Downs.. ok for perm... 9/30/2002 2:25:01 PM
MEC02-01891 Final9/30/20029/30/20029/30/2002 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 09/30/2002 at 06:47:07. Contact: ###-####. code is 7550;... assigned in error 9/30/2002 6:44:57 PM
MEC02-02255 Final9/30/20029/30/20029/30/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 09/30/2002 at 06:47:49. Contact: ###-####. code is2222 reschedule 9/30/2002 6:14:28 PM
BLD01-00379 BLD-Conference9/30/20029/30/20029/30/2002 12:00:00 AMPPASS
needs to extend permit got post card mailed...large project, WIP. 9/30/2002 1:59:37 PM
BLD02-01353 BLD-Framing/Rough-in9/30/20029/30/20029/30/2002 12:00:00 AMPPART
###-#### hanger ok, ok to cover all 9/30/2002 5:30:22 PM
MEC02-01572 Final9/30/20029/30/20029/30/2002 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 09/30/2002 at 09:43:25. Contact: ###-####.
MEC02-02783 Rough-in9/30/20029/30/20029/30/2002 12:00:00 AMPNR
###-#### no access to house, pt ok 9/30/2002 5:44:47 PM
MEC02-02783 Pressure Test9/30/20029/30/20029/30/2002 12:00:00 AMPPASS
MEC02-02698 Pressure Test9/30/20029/30/20029/30/2002 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 09/30/2002 at 09:46:46. Contact: ###-####.
MEC02-02779 Final9/30/20029/30/20029/30/2002 12:00:00 AMPNH
Scheduled by a contractor via Hello! on 09/30/2002 at 10:28:34. Contact: ###-####...no access... PT Gauge ? 9/30/2002 6:01:02 PM
BLD02-01735 BLD-Conference9/30/20029/30/20029/30/2002 12:00:00 AMPPART
keep c/n, need rated or solid door...may overlay door to match existing interior 9/30/2002 2:01:04 PM
BLD02-01783 BLD-Framing/Rough-in9/30/20029/30/20029/30/2002 12:00:00 AMPPART
grid ok, 4" to structure 9/30/2002 2:48:33 PM
BLD02-01784 BLD-Framing/Rough-in9/30/20029/30/20029/30/2002 12:00:00 AMPPART
grid grid ok 9/30/2002 2:48:52 PM
BLD02-01782 BLD-Framing/Rough-in9/30/20029/30/20029/30/2002 12:00:00 AMPPART
DAVE; Phone #: ###-#### Internet Inspection Request from: Darla Downs grid ok 9/30/2002 2:48:39 PM
MEC02-02764 Pressure Test9/27/20029/30/20029/30/2002 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 09/27/2002 at 15:48:07. Contact: ###-####.
MEC02-02764 Final9/27/20029/30/20029/30/2002 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 09/27/2002 at 15:48:28. Contact: ###-####.
MEC02-02639 Final9/26/20029/30/20029/30/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 09/26/2002 at 14:05:53. Contact: ###-####. not wired or operational 9/30/2002 5:54:09 PM