BLD02-02743
| FIRE-Conference | 9/25/2003 | 9/30/2003 | 9/30/2003 12:00:00 AM | A | PART |
|
|
don; Phone #: ###-#### Internet Inspection Request from: Darla Downs met architect, mechanical engineer, GC, Tom A., Dixie about mechanical system and smoke/fire dampers; a letter from the architect will follow to address all items discussed; told them the need to get with the alarm vender to adjust/resubmit plans 9/30/2003 12:38:08 PM
|
FIR03-00243
| INSP-Final Inspection | 9/26/2003 | 9/30/2003 | 9/30/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 9/26/2003 at 2:43:27 PM. Contact: ###-####.
|
BLD02-03075
| FIRE-Conference | 9/29/2003 | 9/30/2003 | 9/30/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 9/29/2003 at 1:00:07 PM. Contact: ###-####. Met with GC and electrician about smoke detectors; install in locations as shown on plans but they will be located close to the kitchen requiring silencing option; need 177 cd in ADA rooms 9/30/2003 12:35:54 PM
|
FIR03-00241
| INSP-Final Inspection | 9/29/2003 | 9/30/2003 | 9/30/2003 12:00:00 AM | A | PASS |
|
|
Please call 1 hour in advance in order to schedule with the owner. Thankyou; Phone #: ###-#### Internet Inspection Request from: Trent Bice
|
FIR03-00462
| INSP-Sprinkler Rough-in/Hydro | 9/30/2003 | 9/30/2003 | 9/30/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 9/30/2003 at 9:02:09 AM. family room okay to cover; submit as-builts with changes and any needed calc's 9/30/2003 2:20:22 PM
|
BLD03-01289
| FIRE-Final Inspection | 9/30/2003 | 9/30/2003 | 9/30/2003 12:00:00 AM | P | PASS |
|
|
|
FIR03-00068
| INSP-Sprinkler Rough-in/Hydro | 9/29/2003 | 9/30/2003 | 9/30/2003 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 9/29/2003 at 2:08:05 PM. Contact: ###-####. QR heads installed in all areas; still have tape on heads in stairs; system over 175 psi and a pressure reducing valve is supposed to be coming; bell still not attached to wall; fire pump room requires firestopping at floor joint; will need all certification paperwork at final 9/30/2003 4:15:42 PM
|