Inspections for the day of: Thursday, September 30, 2004.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Kinnear
TitleELE-INSPECTOR
Phone #794-1379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE04-01988 ELE-Aging Inspection9/30/20049/30/20049/30/2004 12:00:00 AM PASS
ok signs final 10/4/2004 9:26:26 AM
ELE04-01263 Final9/27/20049/30/20049/30/2004 12:00:00 AMAPASS
This is a clean and non-clean area we built out in building 24E. This can be inspected any time this week.; Phone #: ###-#### Internet Inspection Request from: Eric Landberg ok final 9/30/2004 7:53:18 AM
ELE04-01990 Electrical Rough-In9/28/20049/30/20049/30/2004 12:00:00 AMAPASS
Interior wall rough-in inspection in bldg.2.; Phone #: ###-#### Internet Inspection Request from: Del Elwood ok cover wall 9/30/2004 8:09:55 AM
ELE04-02447 Final9/29/20049/30/20049/30/2004 12:00:00 AMAPASS
This was the old Fab 4B smock & bootie room that was remodeled into production clean room space.; Phone #: ###-#### Internet Inspection Request from: Eric Landberg ok final 9/30/2004 7:53:37 AM
ELE04-02737 Final9/29/20049/30/20049/30/2004 12:00:00 AMAPASS
THANK YOU!!!; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH ok final 9/30/2004 10:06:39 AM
ELE04-02992 Permanent Service9/30/20049/30/20049/30/2004 12:00:00 AMAPASS
p/s o/h n ok
ELE04-02992 Electrical Rough-In9/29/20049/30/20049/30/2004 12:00:00 AMACANC
Phone #: ###-#### Internet Inspection Request from: Jeff Radford wrong type inspection 9/30/2004 10:54:31 AM
ELE04-02993 Temporary Service9/29/20049/30/20049/30/2004 12:00:00 AMACANC
Phone #: ###-#### Internet Inspection Request from: Jeff Radford not connected directly to IPCO temp from pressent building 9/30/2004 10:53:17 AM
ELE04-02280 Final9/30/20049/30/20049/30/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 9/30/2004 at 6:19:28 AM. Contact: ###-####. ok final 9/30/2004 3:05:28 PM
ELE04-03000 Temporary Service9/30/20049/30/20049/30/2004 12:00:00 AMPFAIL
###-#### - todd nec 110.3(B) wrong brkers in panal 9/30/2004 12:51:41 PM
ELE04-03001 Temporary Service9/30/20049/30/20049/30/2004 12:00:00 AMPPASS
###-#### - todd
t/s u/g n ok 9/30/2004 12:48:40 PM
ELE04-02660 Final9/30/20049/30/20049/30/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 9/30/2004 at 11:26:22 AM. Contact: ###-####. 404 oked 9/22/04 ok final 9/30/2004 2:59:44 PM
ELE04-02997 Permanent Service9/30/20049/30/20049/30/2004 12:00:00 AMPPASS
p/s o/h n ok
ELE04-02941 Rough-In Permanent Service9/29/20049/30/20049/30/2004 12:00:00 AMPPASS
Internet Inspection Request from: Bob Glenn ok cover ri
p/s u/g n ok 9/30/2004 5:28:53 PM
ELE04-02983 Temporary Service9/30/20049/30/20049/30/2004 12:00:00 AMPPASS
Phone #: ###-#### Internet Inspection Request from: Jeff Radford
t/s u/g n ok 9/30/2004 2:40:46 PM
ELE04-02997 Final9/30/20049/30/20049/30/2004 12:00:00 AMPPASS
###-#### - CHUCK ok final air cond. 9/30/2004 5:28:15 PM
ELE04-02469 Final9/30/20049/30/20049/30/2004 12:00:00 AMPPASS
allen; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok final 9/30/2004 12:24:51 PM
ELE04-02209 Electrical Rough-In9/30/20049/30/20049/30/2004 12:00:00 AMPPART
Mike, this is for above the cieling, so they can cover/put tiles in. The floor box will be eliminated and the table will be wired directly. A final will be called when the table is in. Thanks.; Phone #: ###-#### Internet Inspection Request from: Justin Yount ok cover ceiling corrections are not completed 9/30/2004 12:25:55 PM