BLD04-03049
| FIRE-Final Inspection | 9/29/2005 | 9/30/2005 | 9/30/2005 4:58:37 PM | P | CANC |
|
|
Cancel inspection per Russ the general contractor.
|
FIR05-00273
| INSP-Final Inspection | 9/30/2005 | 9/30/2005 | 9/30/2005 2:43:38 PM | P | FAIL |
|
|
The resubmitted plans for field changes still do not match the installation as required, the first floor main and riser room locations are not accurate showing on opposite sides of the building from the actual install.
|
FIR05-00633
| INSP-Final Inspection | 9/30/2005 | 9/30/2005 | 9/30/2005 1:24:55 PM | P | PASS |
|
|
Fire sprinkler passed final inspection, permit finaled.
|
FIR05-00428
| INSP-Sprinkler Rough-in | 9/29/2005 | 9/30/2005 | 9/30/2005 12:55:08 PM | A | PART |
|
|
Relocated heads in storage room 132, EQ bracing in corridor, and head at north entry vestibule are acceptable.
|
BLD05-01033
| FIRE-Final Inspection | 9/29/2005 | 9/30/2005 | 9/30/2005 12:52:22 PM | A | FAIL |
|
|
Provide signage above main entry/exit doors stating " this door to remain unlocked while building is occupied", repair non functioning emergency light, install and tag fire extinguisher as discussed.
|
FIR05-00520
| INSP-Sprinkler Rough-in/Hydro | 9/29/2005 | 9/30/2005 | 9/30/2005 11:11:54 AM | A | PART |
|
|
Branch line directly above electrical panel needs to be relocated, the remainder of overhead rough-in is good for cover.
|
BLD05-02312
| FIRE-Final Inspection | 9/29/2005 | 9/30/2005 | 9/30/2005 9:48:31 AM | A | PASS |
|
|
Fire life safety passed inspection.
|
MIS05-00158
| FIR-Final | 9/29/2005 | 9/30/2005 | 9/30/2005 9:47:18 AM | A | PASS |
|
|
Issues on correction notice have been addressed, fire life safety acceptable.
|
BLD05-01033
| FIRE-Final Inspection | 9/30/2005 | 9/30/2005 | 9/30/2005 12:00:00 AM | P | PASS |
|
|
Fire life safety finaled.
|