FIR06-00620
| INSP-Alarm Testing | 9/26/2008 | 9/30/2008 | 10/1/2008 5:01:22 PM | A | PART |
|
|
Tested remainder of smoke and heat detectors at the above ceiling areas noted on 1st floor drawings, see plans for locations of spot detectors at the 2nd floor ceiling tested today marked in green, noted overspaced area at the NE corner, inspection completed on 9/30 (PM).
|
FIR08-00278
| INSP-Final Inspection | 9/30/2008 | 9/30/2008 | 10/1/2008 4:56:24 PM | P | DEFR |
|
|
See inspection notes dated 10/1.
|
FIR08-00289
| INSP-Final Inspection | 9/30/2008 | 9/30/2008 | 10/1/2008 4:55:53 PM | P | DEFR |
|
|
See inspection notes dated 10/1
|
FIR08-00424
| INSP-Final Inspection | 9/30/2008 | 9/30/2008 | 10/1/2008 2:28:45 PM | P | NR |
|
|
Project scope is incomplete.
|
BLD07-03215
| FIRE-Final Inspection | 9/30/2008 | 9/30/2008 | 9/30/2008 4:43:49 PM | P | FAIL |
|
|
Walk-in cooler was required to have sprinkler heads added and was addresssed on fire plan review notes.No sprinkler heads were added, a fire sprinkler permit is required for this work. No fire extinguishers were installed and will need to be added.KR
|
FIR08-00309
| INSP-Final Inspection | 9/30/2008 | 9/30/2008 | 9/30/2008 2:05:46 PM | P | PASS |
|
|
Correction notice items have been repaired, two missing 401 canopies installed while on site, fire sprinkler permit finaled.
|
FIR08-00391
| INSP-Final Inspection | 9/29/2008 | 9/30/2008 | 9/30/2008 2:03:19 PM | A | PASS |
|
|
Fire alarm permit work passed field inspection, building map updated while on site, signals verified, as-builts for address changes recieved. Tested tamper at the PIV due to device replacement, noted access for the duct detector above the cooler to be provided prior to building life safety final approval. Fire alarm permit finaled.
|
BLD08-01294
| FIRE-Final Inspection | 9/30/2008 | 9/30/2008 | 9/30/2008 1:59:21 PM | P | PART |
|
|
Fire life safety final pending project related fire sprinkler permit final for field ceiling tile installation at conference rooms on the 4th,5th and 6th floors. Previous c/n items are finished.
|
FIR08-00517
| INSP-Final Inspection | 9/30/2008 | 9/30/2008 | 9/30/2008 1:56:09 PM | P | PART |
|
|
Correction notice items verified for completion, final pending field ceiling tile at conference rooms on the 4th, 5th and 6th floors.
|
BLD08-01294
| FIRE-Final Inspection | 9/29/2008 | 9/30/2008 | 9/30/2008 1:53:59 PM | A | FAIL |
|
|
Need to install one additional exit sign and provide three EM lights per plan at the multipurpose room on the 4th floor, noted missing door hardware at one office 4th floor, repair one EM light at the 5th floor, repair four emergency lights at the 6th floor-one at the open office north side, one in the cable room and two at the server room.
|
FIR08-00631
| INSP-Sprinkler Rough-in | 9/29/2008 | 9/30/2008 | 9/30/2008 1:30:35 PM | P | PASS |
|
|
Underground OK to cover. KR
|
FIR08-00380
| FIR-Aging Inspection | 9/30/2008 | 9/30/2008 | 9/30/2008 10:12:30 AM | | DONE |
|
|
Per phone conversation with contractor work is in progress. Inspection pending completion of work within the next two weeks.
|