ELE07-03691
| Final | 9/22/2008 | 9/30/2008 | 9/30/2008 5:56:45 PM | P | FAIL |
|
|
dennis - ###-#### 324 & 412 -- correction bbc no bld permit shall acquired by 10-03-08 & electrical contractor shall get permit for work they have been by 10-02-08 or power will be turned off to building. (label meters with address's)
|
ELE08-00307
| Electrical Rough-In | 9/30/2008 | 9/30/2008 | 9/30/2008 5:52:47 PM | P | CANC |
|
|
Ceiling inspection - see Dave on site Phone #: ###-#### Internet Inspection Request from: John Campbell wrong type inspection
|
ELE08-00307
| Conference | 9/30/2008 | 9/30/2008 | 9/30/2008 5:52:20 PM | P | DONE |
|
|
Ceiling inspection - see Dave on site Phone #: ###-#### Internet Inspection Request from: John Campbell needs abrasion protection for pendant cords threw ceiling tiles
|
ELE08-00306
| Electrical Rough-In | 9/30/2008 | 9/30/2008 | 9/30/2008 3:22:53 PM | P | CANC |
|
|
Ceiling inspection - see Dave on site Phone #: ###-#### Internet Inspection Request from: John Campbell wrong type inspection
|
ELE08-00306
| Conference | 9/30/2008 | 9/30/2008 | 9/30/2008 3:22:26 PM | P | DONE |
|
|
Ceiling inspection - see Dave on site Phone #: ###-#### Internet Inspection Request from: John Campbell needs to remove tiles & finish all the ceilings
|
ESC06-01855
| General Inspection | 9/30/2008 | 9/30/2008 | 9/30/2008 3:20:18 PM | P | PASS |
|
|
sign posted site looks fine
|
ELE08-00305
| Final | 9/30/2008 | 9/30/2008 | 9/30/2008 3:19:48 PM | P | CANC |
|
|
see Dave on site Phone #: ###-#### Internet Inspection Request from: John Campbell wrong type inspection
|
ELE08-00305
| Conference | 9/30/2008 | 9/30/2008 | 9/30/2008 3:19:24 PM | P | DONE |
|
|
see Dave on site Phone #: ###-#### Internet Inspection Request from: John Campbell job not ready for final on core & shell
|
ELE08-01909
| Final | 9/29/2008 | 9/30/2008 | 9/30/2008 11:47:35 AM | A | PASS |
|
|
Pool House is open. Phone #: ###-#### Internet Inspection Request from: Joseph Zumwalt ok final note no esc permit in project
|
ELE07-04161
| Electrical Rough-In | 9/29/2008 | 9/30/2008 | 9/30/2008 10:43:29 AM | A | PASS |
|
|
call to meet Phone #: ###-#### Internet Inspection Request from: mark morris ok cover ceiling anop note no esc permit in project
|
ELE08-02657
| Electrical Rough-In | 9/29/2008 | 9/30/2008 | 9/30/2008 9:48:20 AM | A | PART |
|
|
Pat, Please call me as soon as you can Phone #: ###-#### Internet Inspection Request from: jason shifflett ok cover under ground cable only conf. 1 1/4inch stapling cable, drilling center on stud or use nail plates, use approved choke or plastic romex connector for grounding electrode conductor, & needs brker lock down for main brker in panel. note esc permit has been finaled.
|
ELE08-02473
| Electrical Rough-In | 9/29/2008 | 9/30/2008 | 9/30/2008 9:29:28 AM | A | PART |
|
|
Please provide electrical rough-in inspection for wall and ceilling covering. Please contact Kelly with any questions ###-####. Phone #: ###-#### Internet Inspection Request from: Spencer Mclean ok cover walls only ceiling not ready note no esc permit in project
|
ELE08-02398
| Final | 9/29/2008 | 9/30/2008 | 9/30/2008 8:18:15 AM | A | PASS |
|
|
ed Phone #: ###-#### ok final note no esc permit in project
|
ELE08-02657
| Electrical Rough-In | 9/30/2008 | 9/30/2008 | 9/30/2008 12:00:00 AM | P | CANC |
|
|
dave Phone #: ###-####
|
ELE08-02596
| Electrical Rough-In | 9/25/2008 | 9/30/2008 | 9/25/2008 4:08:20 PM | A | CANC |
|
|
ready for reinspection Phone #: ###-#### Internet Inspection Request from: gary batten Inspection cancelled from web by: gary batten
|