ESC06-01742
| Site Final | 9/26/2008 | 9/30/2008 | 9/30/2008 3:27:30 PM | A | PASS |
|
|
|
ESC08-00655
| Complaint Inspection | 9/30/2008 | 9/30/2008 | 9/30/2008 3:08:26 PM | P | PART |
|
|
Correction to rp in regards to site bmp maintance and additiona bmps prior to forcasted rain by Friday, Oct. 3. Will follow up.
|
ESC08-00706
| General Inspection | 9/30/2008 | 9/30/2008 | 9/30/2008 2:56:04 PM | P | FAIL |
|
|
Small open canal running through active construction site. Area has been worked, bare soil on both sides of ditch. Instructed contractor/RP to provide protection until water is turned off and then piping can be performed. Ditch was running during inspection. Need to keep construction entrance maintained as wet season is approaching.
|