ESC09-00507
| General Inspection | 9/30/2009 | 9/30/2009 | 9/30/2009 2:52:21 PM | A | PART |
|
|
Upper slope is track walked and sediment barriers in place to break up the slope. Hyd. application is being performed. Bottom slope still in need of work and road needs water barriers and collection area at bottom.
|