GCB09-00029
| GCB-Final | 9/30/2009 | 9/30/2009 | 9/30/2009 3:42:37 PM | P | PASS |
|
|
mech Phone #: ###-####. Final ok.
|
GCB09-00028
| GCB-Final | 9/30/2009 | 9/30/2009 | 9/30/2009 3:42:15 PM | P | PASS |
|
|
mech Phone #: ###-####. Final ok.
|
BLD09-01046
| BLD-Final | 9/30/2009 | 9/30/2009 | 9/30/2009 3:13:51 PM | P | FAIL |
|
|
rustin Phone #: ###-####. Needs to provide address and insulation cert. c/n posted.
|
ESC09-00388
| Site Final | 9/30/2009 | 9/30/2009 | 9/30/2009 3:13:12 PM | P | FAIL |
|
|
70% reveg not reached.
|
BLD08-01682
| BLD-Foundation | 9/30/2009 | 9/30/2009 | 9/30/2009 1:44:54 PM | P | PART |
|
|
jack Phone #: ###-####. wip on installing holddowns. All rebar in place.
|
ESC08-00657
| Random Inspection | 9/30/2009 | 9/30/2009 | 9/30/2009 1:44:15 PM | P | PASS |
|
|
|
BLD09-01309
| BLD-Final | 9/29/2009 | 9/30/2009 | 9/30/2009 12:09:53 PM | A | FAIL |
|
|
Matt Phone #: ###-####. Cannot verify attachment for 1hr. wall or membrane protection at lights for 1hr. wall. c/n posted.
|
MIS09-00178
| BLD-Conference | 9/29/2009 | 9/30/2009 | 9/30/2009 11:15:36 AM | A | DONE |
|
|
working with out a permit ( possible fire issue). Roofing contractor working with no permits in apartment complex. Will be doing all bldgs. Noted to roofing contractor owner to go to city hall by end of busines today and get all applicable roofing permits.
|