Inspections for the day of: Thursday, September 30, 2010.
Number of inspections: 1
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00657 Site Preparation9/30/20109/30/20109/30/2010 2:47:43 PMPPART
Work has started. Verbal correction discussed with Mike, (Avalon) Steve (Farwest), Jerry F. (Owner). Items of discussion; Trackwalk slopes daily, phases and stablize per approved plan, work silt fence, (part installed in-correctly), installation of wattles at misc locations including specifically at drainages, beef up drainages with bales of straw installed correctly and install rock construction entrance. As well, requested location of soils which will be exported off site. Will follow up.