FIR11-00483
| INSP-Sprinkler Rough-in/Hydro | 9/30/2011 | 9/30/2011 | 9/30/2011 4:45:09 PM | P | PASS |
|
|
UG fire supply line hydrostatic testing passed.
|
FIR11-00186
| INSP-Alarm Testing | 9/29/2011 | 9/30/2011 | 9/30/2011 4:07:01 PM | A | PART |
|
|
As late as possible Phone #: 2089411846 >> Inspection requested via mobile web by Brian Anderson
|
FIR11-00414
| INSP-Sprinkler Rough-in/Hydro | 9/29/2011 | 9/30/2011 | 9/30/2011 3:07:01 PM | P | PASS |
|
|
UG fire supply line hydrostatic test passed.
|
FIR11-00026
| INSP-Final Inspection | 9/29/2011 | 9/30/2011 | 9/30/2011 2:42:50 PM | A | FAIL |
|
|
The auxiliary power supply arrangement for the IPDACT does not meet product installation guidelines. Wiring must be in accordance with NFPA 70 and 72. Address correction for account monitoring completed while on site.
|
BLD11-01345
| FIRE-Final Inspection | 9/30/2011 | 9/30/2011 | 9/30/2011 12:31:04 PM | P | PASS |
|
|
Fire life safety finaled.
|
BLD11-01627
| FIRE-Final Inspection | 9/28/2011 | 9/30/2011 | 9/30/2011 12:29:45 PM | A | PASS |
|
|
C/N items finished. Fire life safety inspection passed.
|
FIR11-00447
| INSP-Final Inspection | 9/29/2011 | 9/30/2011 | 9/30/2011 12:28:38 PM | A | PASS |
|
|
Correction items verified for completion. Fire alarm permit finaled.
|
BLD10-02862
| FIRE-Final Inspection | 9/29/2011 | 9/30/2011 | 9/30/2011 10:42:32 AM | A | PASS |
|
|
Fire life safety inspection passed.
|
FIR11-00355
| INSP-Sprinkler Rough-in | 9/28/2011 | 9/30/2011 | 9/30/2011 10:17:50 AM | A | FAIL |
|
|
Upright heads at the first floor corridor are blocked by adjacent truss webs due to distance of the deflector from the deck, two pendent heads at classroom 201 need to meet fig. 8.6.5.1.2(b) NFPA 13, storage room 204 uprights are obstructed by ductwork. Remainder of drop ceiling areas are okay for cover.
|