FIR06-00015
| FIR-Aging Inspection | 9/30/2011 | 9/30/2011 | 10/6/2011 8:40:23 AM | | NR |
|
|
I forwarded this permit number and status to scott for further action.
|
BLD10-02870
| FIRE-Final Inspection | 9/28/2011 | 9/30/2011 | 9/30/2011 3:37:12 PM | A | FAIL |
|
|
This project was not ready for life safety inspection but mike and I went over life safety items that will need addressed such as an "opticon" for the electric gate.
|
BLD11-02132
| FIRE-Final Inspection | 9/30/2011 | 9/30/2011 | 9/30/2011 3:33:49 PM | P | FAIL |
|
|
See the red line comments on the city approved plans for correction items. They include painting the address, repairing the exit signs, providing exit discharge lighting and providing single action hardware.
|
FIR11-00399
| INSP-Final Inspection | 9/30/2011 | 9/30/2011 | 9/30/2011 2:48:37 PM | P | FAIL |
|
|
Tested the flow switch, tamper #1 and main lobby pull station. Paul received the signals from the relays but no informaton from the intela tap came in.
|
BLD11-01879
| FIRE-Final Inspection | 9/30/2011 | 9/30/2011 | 9/30/2011 2:09:40 PM | P | PASS |
|
|
Life safety passed.
|
BLD10-02666
| FIRE-Conference | 9/30/2011 | 9/30/2011 | 9/30/2011 2:09:03 PM | P | DONE |
|
|
Spoke to the insulation contractor about providing the necessary access points to verify that the combustible concealed spaced are completely filled with noncombustible insulation.
|
FIR11-00508
| INSP-Sprinkler Rough-in | 9/29/2011 | 9/30/2011 | 9/30/2011 12:42:15 PM | A | FAIL |
|
|
No inspection was performed due to the ceiling tile being installed.
|
FIR11-00464
| INSP-Supply line flush | 9/29/2011 | 9/30/2011 | 9/30/2011 11:29:44 AM | A | PASS |
|
|
The supply line flush passed.
|
FIR11-00529
| INSP-Final Inspection | 9/29/2011 | 9/30/2011 | 9/30/2011 11:26:43 AM | A | FAIL |
|
|
One of the new pendants installed in the corridor has been placed less than 6' from an existing pendant. Other heads are ok.
|
BLD09-00832
| FIRE-Final Inspection | 9/29/2011 | 9/30/2011 | 9/30/2011 11:16:14 AM | A | FAIL |
|
|
Provide fire dept access curb painting as discussed.
|
BLD11-01879
| FIRE-Final Inspection | 9/29/2011 | 9/30/2011 | 9/30/2011 10:09:59 AM | A | FAIL |
|
|
Provide smoke detector at the north exit as per plans and provide the required exit sign/emergency lighting and exit discharge lighting per plans. Per Sam the exit signs in the classrooms can be deleted since the occupant load does not exceed 10.
|