BLD12-02682
| FIRE-Final Inspection | 9/30/2013 | 9/30/2013 | 9/30/2013 3:42:51 PM | P | PASS |
|
|
Life safety passed
|
FIR13-00401
| INSP-Sprinkler Rough-in/Hydro | 9/30/2013 | 9/30/2013 | 9/30/2013 3:31:00 PM | A | PASS |
|
|
Overhead hydro test passed
|
FIR13-00250
| INSP-Supply line flush | 9/27/2013 | 9/30/2013 | 9/30/2013 3:25:44 PM | A | PASS |
|
|
Underground flush passed
|