Inspections for the day of: Tuesday, September 30, 2014.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00929 Site Preparation9/30/20149/30/20149/30/2014 3:25:38 PMPPASS
Earth Energy on site making preparations for utility project. No MS4 or surface waters in project area. Drainage flows to airport's perimeter berm & swale. Approved.
ESC12-00539 General Inspection9/30/20149/30/20149/30/2014 2:56:15 PM PASS
ESC14-00360 General Inspection9/30/20149/30/20149/30/2014 2:41:35 PM PASS
Framing in progress. No trackout or other issues observed. Permit posted on front gate.
ESC13-00981 Aging Inspection9/30/20149/30/20149/30/2014 12:05:40 PM PASS
ESC13-00982 Aging Inspection9/30/20149/30/20149/30/2014 12:05:24 PM PASS
ESC13-00969 DOC - Permit Finaled9/30/20149/30/20149/30/2014 12:03:53 PMPPASS
Exterior work is complete, yard is landscaped/stabilized. BLD still open for remaining interior work. Numerous open ESC permits adjacent to site. No further inspections for this home.
ESC13-01279 Tracking Control9/30/20149/30/20149/30/2014 12:00:24 PMPPASS
2 corrections at Lucky Harris sub development:

1. Sweep, clean, and maintan DI bag at corner Eckart and Arrow Junction.

2. Restrict construction vehicle access to the designated south entrance (not Ranch Market access)

RP Chad stated that Syman Co. will be cleaning inlet today or tomorrow AM and that he will coordinate with Ranch Market builders to come to agreement on their construction entrance.

Will continue to monitor this week.
ESC14-00104 DOC - Permit Finaled9/30/20149/30/20149/30/2014 11:39:47 AMPPASS
Home complete, landscaped, and occupied. All other permits finaled. ESC permit conditions satisfied.
ESC14-00333 Tracking Control9/30/20149/30/20149/30/2014 11:36:43 AMPFAIL
Trackout to Eckart due to failed construction entrance. Ranch Market is having cement trucks on site this week for parking lot and curb work. It should be noted that some vehicles for Lucky Harris sub have also been using the entrance and that the utility line project remove a portion of the initial entrance.

Verbal correction notice to RP Chuck to provide new construction entrance and clean up trackout to Eckart by end of the day/tommorrow AM. He agreed and said rock for the entrance has already been ordered.

I will request to Lucky Harris crew to not use the Ranch Market entrance, and to use their designated entrance to the south.
ESC11-00525 Aging Inspection9/30/20149/30/20149/30/2014 11:32:49 AM PART
Mill District Square construction is ongoing with open lots/areas being utilized for Brighton Homes operations. The square is about 60% occupied.

Streets are clean, lined washout has adequate capacity, SWPPP and ESC permit on site. The site is in pretty good condition after the weekend rainfall.

Corrections:

1. Replace/fix DI bag on alley in between Sawmill and Eckart.
2. Scoop accumulated sediment & mud at mouths of all DIs in gutters.
3. Josh from Brighton Homes stated he is having a company remove all miscellaneous stockpiles of materials on open lots and will discuss BMPs with stucco crews.

Brighton Homes and Brighton Corp have been verbally notified of the corrections.
ESC13-00490 General Inspection9/30/20149/30/20149/30/2014 9:53:32 AM PASS
WIP on gutting old Jackson's store. No trenching or lineal work on hardscapes, the hole for the rear addition has been dug and stormwater flows inward to site. No corrections at this time.
ESC14-00188 General Inspection9/30/20149/30/20149/30/2014 8:41:45 AM PASS
This phase of Old Boise Streetscape project is currently inactive and possibly complete. Need to check with contractor. Some temporary DI filter bags are installed and there is work ongoing in other phases of project. BLD permit still open. No corrections at this time.