ESC13-01052
| Aging Inspection | 9/30/2014 | 9/30/2014 | 9/30/2014 4:11:53 PM | | PASS |
|
|
WIP No ESC Issues
|
ESC13-01054
| Aging Inspection | 9/30/2014 | 9/30/2014 | 9/30/2014 1:55:40 PM | | PASS |
|
|
waiting on re-vegetation practices to take place, prior to finaling out ESC permit
|
ESC13-00125
| General Inspection | 9/30/2014 | 9/30/2014 | 9/30/2014 12:07:55 PM | | PASS |
|
|
No Activity. Large Stockpile of topsoil and concrete rubble pile still onsite. No ESC Issues at this time. Will keep this permit open until the Esther Simplot Project Begins
|
ESC14-00257
| General Inspection | 9/30/2014 | 9/30/2014 | 9/30/2014 10:48:49 AM | | PASS |
|
|
|
ESC14-00069
| General Inspection | 9/30/2014 | 9/30/2014 | 9/30/2014 8:47:54 AM | | FAIL |
|
|
Contractor had Curtis Clean Sweep out onsite to sweep yesterdays trackout issues, but did not address construction entrance. Significant Trackout occuring through out project and onto Florence Dr. Contractor called Curtis Clean Sweep while I was talking with him to get area swept again. He will fluff up and add additional rock to construction entrance and block off areas to reduce trackout from vehicle traffic.
|
ESC14-00060
| General Inspection | 9/30/2014 | 9/30/2014 | 9/30/2014 8:47:26 AM | | FAIL |
|
|
Contractor had Curtis Clean Sweep out onsite to sweep yesterdays trackout issues, but did not address construction entrance. Significant Trackout occuring through out project and onto Florence Dr. Contractor called Curtis Clean Sweep while I was talking with him to get area swept again. He will fluff up and add additional rock to construction entrance and block off areas to reduce trackout from vehicle traffic.
|
ESC14-00255
| General Inspection | 9/30/2014 | 9/30/2014 | 9/30/2014 8:19:12 AM | | PASS |
|
|
Drop Inlets now protected. 2 Small stockpiles located in east side of building, but no esc issues at this time.
|