PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Wednesday, September 30, 2015
.
Number of inspections:
17
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC14-01097
General Inspection
9/30/2015
9/30/2015
9/30/2015 4:38:55 PM
PASS
ESC15-01155
Site Preparation
9/28/2015
9/30/2015
9/30/2015 4:20:48 PM
P
PASS
Bob Phone #: ###-####
ESC15-00475
Aging Inspection
9/30/2015
9/30/2015
9/30/2015 4:14:58 PM
PASS
WIP. Foundation is poured, ready for framing. No trackout to street, flat lot. No corrections.
ESC15-00720
General Inspection
9/30/2015
9/30/2015
9/30/2015 4:07:27 PM
P
CANC
ESC15-00031
General Inspection
9/30/2015
9/30/2015
9/30/2015 3:59:13 PM
PASS
Subdivision work complete. 2 SFHs in progress. DIs have inlet protection. No trackout, discharges, or uncontained trash observed. No corrections.
ESC14-00328
General Inspection
9/30/2015
9/30/2015
9/30/2015 3:58:12 PM
PEND
No changes at site. Stock piles are stabile. Project is on hold
ESC15-00948
Site Preparation
9/30/2015
9/30/2015
9/30/2015 3:22:15 PM
P
PASS
Aric Phone #: ###-####
Parking lot and stormwater drainage system replacement approved for construction. BMPs include inlet protection and trackout control. WIP
ESC15-00135
Aging Inspection
9/30/2015
9/30/2015
9/30/2015 2:25:25 PM
PASS
SFH complete. ESC permit conditions satisfied
ESC15-00135
DOC - Permit Finaled
9/30/2015
9/30/2015
9/30/2015 2:25:25 PM
P
PASS
ESC15-00195
Aging Inspection
9/30/2015
9/30/2015
9/30/2015 1:53:18 PM
PASS
ESC14-01131
General Inspection
9/30/2015
9/30/2015
9/30/2015 12:08:12 PM
PASS
ESC14-01131
DOC - Permit Finaled
9/30/2015
9/30/2015
9/30/2015 12:07:58 PM
P
PASS
Some painting and interior work ongoing but groundwork and vertical construction is comoplete. Yard is landscaped and stabilized. No further ESC inspections required, permit conditions satisfied.
ESC14-00928
General Inspection
9/30/2015
9/30/2015
9/30/2015 9:47:53 AM
P
PASS
WIP on 10th & Grove condos (119 Grove). Site perimeter has some minor amounts of loose sediment and sand that should be swept. Trash and materials are contained. No discharges or runoff from site. No violations observed.
Note: Project related permit ESC14-00713 for the foundation and initial site work has been finaled.
ESC14-00713
DOC - Permit Finaled
9/30/2015
9/30/2015
9/30/2015 9:45:49 AM
P
PASS
Foundation and canal bridge phase complete. Vertical work on 119 Grove condos is in progress. Work now inspected under ESC14-00928
ESC15-00470
DOC - Permit Finaled
9/30/2015
9/30/2015
9/30/2015 9:31:54 AM
P
PASS
ESC15-00470
Aging Inspection
9/30/2015
9/30/2015
9/30/2015 9:31:46 AM
PASS
No activity or earth disturbance at site.. Pool installed. Permit closed.
ESC12-00130
General Inspection
9/30/2015
9/30/2015
9/30/2015 9:08:37 AM
PEND
Exterior work complete, some activity on-going on the inside. Staging area is now de-commisioned and washout container and other materials removed. Working with McAlvain to get all DIs on Royal (both sides of street) removed.
Need to have ACHD investigate an odor in the MS4 system in this area...