Inspections for the day of: Wednesday, September 30, 2015.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-01097 General Inspection9/30/20159/30/20159/30/2015 4:38:55 PM PASS
ESC15-01155 Site Preparation9/28/20159/30/20159/30/2015 4:20:48 PMPPASS
Bob Phone #: ###-####
ESC15-00475 Aging Inspection9/30/20159/30/20159/30/2015 4:14:58 PM PASS
WIP. Foundation is poured, ready for framing. No trackout to street, flat lot. No corrections.
ESC15-00720 General Inspection9/30/20159/30/20159/30/2015 4:07:27 PMPCANC
ESC15-00031 General Inspection9/30/20159/30/20159/30/2015 3:59:13 PM PASS
Subdivision work complete. 2 SFHs in progress. DIs have inlet protection. No trackout, discharges, or uncontained trash observed. No corrections.
ESC14-00328 General Inspection9/30/20159/30/20159/30/2015 3:58:12 PM PEND
No changes at site. Stock piles are stabile. Project is on hold
ESC15-00948 Site Preparation9/30/20159/30/20159/30/2015 3:22:15 PMPPASS
Aric Phone #: ###-####

Parking lot and stormwater drainage system replacement approved for construction. BMPs include inlet protection and trackout control. WIP
ESC15-00135 Aging Inspection9/30/20159/30/20159/30/2015 2:25:25 PM PASS
SFH complete. ESC permit conditions satisfied
ESC15-00135 DOC - Permit Finaled9/30/20159/30/20159/30/2015 2:25:25 PMPPASS
ESC15-00195 Aging Inspection9/30/20159/30/20159/30/2015 1:53:18 PM PASS
ESC14-01131 General Inspection9/30/20159/30/20159/30/2015 12:08:12 PM PASS
ESC14-01131 DOC - Permit Finaled9/30/20159/30/20159/30/2015 12:07:58 PMPPASS
Some painting and interior work ongoing but groundwork and vertical construction is comoplete. Yard is landscaped and stabilized. No further ESC inspections required, permit conditions satisfied.
ESC14-00928 General Inspection9/30/20159/30/20159/30/2015 9:47:53 AMPPASS
WIP on 10th & Grove condos (119 Grove). Site perimeter has some minor amounts of loose sediment and sand that should be swept. Trash and materials are contained. No discharges or runoff from site. No violations observed.

Note: Project related permit ESC14-00713 for the foundation and initial site work has been finaled.
ESC14-00713 DOC - Permit Finaled9/30/20159/30/20159/30/2015 9:45:49 AMPPASS
Foundation and canal bridge phase complete. Vertical work on 119 Grove condos is in progress. Work now inspected under ESC14-00928
ESC15-00470 DOC - Permit Finaled9/30/20159/30/20159/30/2015 9:31:54 AMPPASS
ESC15-00470 Aging Inspection9/30/20159/30/20159/30/2015 9:31:46 AM PASS
No activity or earth disturbance at site.. Pool installed. Permit closed.
ESC12-00130 General Inspection9/30/20159/30/20159/30/2015 9:08:37 AM PEND
Exterior work complete, some activity on-going on the inside. Staging area is now de-commisioned and washout container and other materials removed. Working with McAlvain to get all DIs on Royal (both sides of street) removed.

Need to have ACHD investigate an odor in the MS4 system in this area...