ESC14-00588
| BMP Violation | 9/30/2015 | 9/30/2015 | 9/30/2015 2:33:46 PM | P | PASS |
|
|
concrete washouts reported to be full and spilling..
RP Kevin ###-####
2 new concrete washouts have been installed right before I got there. no other issues observed
|
ESC13-01279
| General Inspection | 9/30/2015 | 9/30/2015 | 9/30/2015 2:06:35 PM | | PASS |
|
|
No ESC Violations observed at time of inspection. WIP on SFD's
|
ESC15-01180
| Site Preparation | 9/30/2015 | 9/30/2015 | 9/30/2015 1:54:41 PM | P | PART |
|
|
Kent Phone #: ###-####
Straw waddles installed on North Hillside. Correction:
1.) Post Permit 2.) Install Concrete Washout
|
ESC14-00462
| General Inspection | 9/30/2015 | 9/30/2015 | 9/30/2015 1:19:48 PM | | PEND |
|
|
awaiting for perm 80% of reveg before ESC permit to be closed on disturbed areas
|
ESC14-00658
| BMP Violation | 9/30/2015 | 9/30/2015 | 9/30/2015 1:07:44 PM | P | CANC |
|
|
follow up inspection Data Entry Error: Supposed to be for tomorrow
|
ESC14-00296
| General Inspection | 9/30/2015 | 9/30/2015 | 9/30/2015 10:48:00 AM | | PASS |
|
|
Vertical Construction still occuring. No trackout or discharges observed.
|
ESC15-00374
| Aging Inspection | 9/30/2015 | 9/30/2015 | 9/30/2015 8:48:39 AM | | DONE |
|
|
|
ESC15-00374
| DOC - Permit Finaled | 9/30/2015 | 9/30/2015 | 9/30/2015 8:48:07 AM | P | PASS |
|
|
ESC Conditions Satisfied
|
ESC14-01066
| General Inspection | 9/30/2015 | 9/30/2015 | 9/30/2015 8:35:14 AM | | DONE |
|
|
|
ESC14-01066
| DOC - Permit Finaled | 9/30/2015 | 9/30/2015 | 9/30/2015 8:34:32 AM | P | PASS |
|
|
ESC Conditions Satisfied
|
ESC15-00511
| BMP Violation | 9/29/2015 | 9/30/2015 | 9/29/2015 2:12:26 PM | P | CANC |
|
|
Data Entry Error. Incorrect Permit Number
|