ELE19-02224
| Electrical Rough-In | 9/27/2019 | 9/30/2019 | 9/30/2019 2:39:21 PM | P | PASS |
|
|
Roof top wall inspection 4th floor area D. Conference on transformer clearance in electrical rooms. Call Lonny when on site. ###-####. Thanks Phone #: ###-#### Inspection requested via web by Lonny Baum Ok cover rest of parapet top floor SE corner. Discussed elec room on 2nd floor for transformer clearences.
|
ELE19-02101
| Final | 9/30/2019 | 9/30/2019 | 9/30/2019 2:03:01 PM | P | PASS |
|
|
call 30 ahead- Larry Phone #: ###-#### Ok final
|
ELE19-03122
| Final | 9/30/2019 | 9/30/2019 | 9/30/2019 1:15:57 PM | P | CANC |
|
|
Plans left on site in the meter box Phone #: ###-#### Inspection requested via web by Kilee Russell
|
ELE19-02716
| Final | 9/30/2019 | 9/30/2019 | 9/30/2019 1:07:56 PM | P | PASS |
|
|
call 30 ahead- Larry Phone #: ###-#### Ok final.
|
ELE18-04010
| Final | 9/30/2019 | 9/30/2019 | 9/30/2019 1:07:35 PM | P | PASS |
|
|
tANYA Phone #: ###-#### PLEASE CALL FOR ACCESS Ok final. Corrections made.
|
ELE19-03694
| Conference | 9/30/2019 | 9/30/2019 | 9/30/2019 12:01:14 PM | P | DONE |
|
|
Dan Phone #: ###-#### Discussed service and wiring inside.
|
ELE19-03608
| Electrical Rough-In | 9/29/2019 | 9/30/2019 | 9/30/2019 10:02:15 AM | A | PASS |
|
|
Requesting an ok to cover. We removed as much of th knob and tube we could get to. We ran all new circuits. And fixed some of the previous shotty newer wiring. Call if you have any questions. Thanks Todd Phone #: ###-#### Inspection requested via web by todd cline Ok cover 2 beds and bath downstairs, and bed, bath and living up, garage. Outlets in kitchen were cutin.
|
ELE19-01669
| Final | 9/29/2019 | 9/30/2019 | 9/30/2019 9:48:53 AM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Tim Dunlop Rescheduled for 10/1
|
ELE19-02667
| Electrical Rough-In | 9/28/2019 | 9/30/2019 | 9/30/2019 9:34:09 AM | A | PASS |
|
|
Am/pm whenever is convenient. Give me a call. Phone #: ###-#### Inspection requested via web by Aaron Mace Ok cover upstairs flr heat.
|
ELE19-00728
| Final | 9/27/2019 | 9/30/2019 | 9/30/2019 9:19:48 AM | A | PASS |
|
|
Call Derek W/Aurora Power to schedule meeting time ###-#### Phone #: ###-#### Inspection requested via web by Alan Lusk Ok final. I finaled solar portion of job, but electrical was never called for a final. Breaker used was a 2 pole 40a on 200a panel.
|
ELE19-03149
| Final | 9/27/2019 | 9/30/2019 | 9/30/2019 9:16:28 AM | A | FAIL |
|
|
Bruce Phone #: ###-#### GFI not functioning properly. Also check for Weather Resistant.
|
ELE19-00728
| Final | 9/27/2019 | 9/30/2019 | 9/27/2019 12:52:14 PM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Alan Lusk Inspection cancelled from web by: Alan Lusk
|