ELE16-02295
| ELE-Aging Inspection | 9/30/2019 | 9/30/2019 | 10/2/2019 2:21:09 PM | | FAIL |
|
|
waiting on contractor
|
ELE19-03095
| Electrical Rough-In | 9/25/2019 | 9/30/2019 | 9/30/2019 3:27:59 PM | P | PASS |
|
|
Please do this inspection around 1PM. Phone #: ###-#### Inspection requested via web by Kilee Russell...UL listed equipment verified...discussed with journeyman-service feeder wire needs verified to be able to carry full load of service and solar
|
ELE19-03697
| Conference | 9/30/2019 | 9/30/2019 | 9/30/2019 2:39:10 PM | P | PASS |
|
|
Requesting conference to discuss electrical panel upgrade from 100 amp to 200 amp service. Planning to do the work on Wednesday this week and would like to ensure that I am all squared away to avoid prolonged period without power to the house. Thank you. I should be on site after 1 pm today. Phone #: ###-#### Inspection requested via web by Tyler Stewart.. reviewed service change requirements...up sizing ground to uffer, new 200A meter base, multibranch circuits to 2-pole breakers and new service wire...homeowner competent..3rd permit pulled
|
ELE19-03674
| Electrical Rough-In | 9/27/2019 | 9/30/2019 | 9/30/2019 1:44:38 PM | P | PASS |
|
|
WALLS IN NEW OFFICE WALLS. ELECTRICIAN ON SITE Phone #: ###-#### Inspection requested via web by Garrett Collins...2 new offices in back walls only...no change in grid-lights repositioned only
|
ELE18-01007
| Final | 9/30/2019 | 9/30/2019 | 9/30/2019 1:09:04 PM | P | PASS |
|
|
Russ-please call when on way Phone #: ###-####...corrections made...ok to final
|
ELE19-03095
| Electrical Rough-In | 9/26/2019 | 9/30/2019 | 9/30/2019 12:32:34 PM | A | CANC |
|
|
We will not be ready for a rough inspection until around 11AM or Noon Phone #: ###-#### Inspection requested via web by Kilee Russell... not ready...please cordinate inspections...Boise City ordinance on inspections is a 4hr window..specific times cannot be requested...thank you
|
ELE19-02006
| Final | 9/29/2019 | 9/30/2019 | 9/30/2019 10:07:17 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...ok to final...card signed
|
ELE19-02977
| Electrical Rough-In | 9/27/2019 | 9/30/2019 | 9/30/2019 9:39:10 AM | A | PASS |
|
|
Brian Prussia is best contact Phone #: ###-#### Inspection requested via web by BRS Permitting...UL listing verified..access needed at final
|
ELE19-03055
| Electrical Rough-In | 9/28/2019 | 9/30/2019 | 9/30/2019 8:52:46 AM | A | PASS |
|
|
ceiling Cover Phone #: ###-#### Inspection requested via web by Tyler Bowen..ceiling ok
|
ELE19-03684
| Temporary Service | 9/27/2019 | 9/30/2019 | 9/30/2019 8:32:49 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Heath Thomas..t/s u/g new ok
|
ELE19-00727
| Final | 9/27/2019 | 9/30/2019 | 9/27/2019 12:48:13 PM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Alan Lusk Inspection cancelled from web by: Alan Lusk
|
ELE19-03603
| Rough-In Permanent Service | 9/26/2019 | 9/30/2019 | 9/26/2019 1:29:00 PM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Dean Gernaat Inspection cancelled from web by: Dean Gernaat
|