BLD19-01486
| BLD-Footing | 9/27/2019 | 9/30/2019 | 9/30/2019 3:46:20 PM | P | NR |
|
|
Jerry Phone #: ###-####
|
BLD19-02307
| BLD-Footing | 9/27/2019 | 9/30/2019 | 9/30/2019 3:46:07 PM | P | PASS |
|
|
Jerry Phone #: ###-####
|
BLD19-02419
| BLD-Footing | 9/27/2019 | 9/30/2019 | 9/30/2019 3:45:54 PM | P | PASS |
|
|
Jerry Phone #: ###-####
|
BLD19-01600
| BLD-Framing/Rough-in | 9/30/2019 | 9/30/2019 | 9/30/2019 3:25:33 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Landvatter. Ok to insulate.
|
BLD18-04288
| BLD-Other | 9/30/2019 | 9/30/2019 | 9/30/2019 3:00:00 PM | P | PASS |
|
|
Rebar and 6x6 mesh building two second floor and screw inspection on the deck second floor Phone #: ###-#### Inspection requested via web by Glen Farrell
|
BLD19-02261
| BLD-Framing/Rough-in | 9/30/2019 | 9/30/2019 | 9/30/2019 2:35:34 PM | P | PASS |
|
|
William Phone #: ###-####
|
BLD19-02238
| BLD-Energy code compliance | 9/27/2019 | 9/30/2019 | 9/30/2019 2:35:05 PM | A | NR |
|
|
Chris Phone #: ###-####.
|
BLD19-02960
| BLD-Ceiling Grid Inspection | 9/30/2019 | 9/30/2019 | 9/30/2019 2:12:44 PM | P | NR |
|
|
Armando-fire sprinkler? Phone #: ###-####. Needs Electrical and fire sprinkler rough ins first.
|
BLD19-02660
| BLD-Final | 9/30/2019 | 9/30/2019 | 9/30/2019 2:06:30 PM | P | PASS |
|
|
Tony Phone #: ###-####. Ok for perm occ.
|
BLD19-02007
| BLD-Conference | 9/30/2019 | 9/30/2019 | 9/30/2019 2:06:04 PM | P | DONE |
|
|
Jim Phone #: ###-####
|
BLD19-02010
| BLD-Conference | 9/30/2019 | 9/30/2019 | 9/30/2019 2:05:49 PM | P | DONE |
|
|
Jim Phone #: ###-####
|
BLD19-02431
| BLD-Framing/Rough-in | 9/30/2019 | 9/30/2019 | 9/30/2019 2:05:49 PM | P | NR |
|
|
Doug Phone #: ###-####. Needs to nail off portal frame.
|
BLD19-02010
| BLD-Wall Bracing | 9/30/2019 | 9/30/2019 | 9/30/2019 2:05:36 PM | P | PASS |
|
|
Jim Phone #: ###-####
|
BLD19-02007
| BLD-Wall Bracing | 9/30/2019 | 9/30/2019 | 9/30/2019 2:05:11 PM | P | PASS |
|
|
Jim Phone #: ###-####
|
BLD19-03512
| BLD-Conference | 9/30/2019 | 9/30/2019 | 9/30/2019 12:55:30 PM | P | DONE |
|
|
Brittany Phone #: ###-####
|
BLD19-01363
| BLD-Framing/Rough-in | 9/27/2019 | 9/30/2019 | 9/30/2019 11:59:07 AM | A | PART |
|
|
Kenny Phone #: ###-####. Provide approved fix for cut top chords of floor joist at plumbing penetrations. Complete fire cauliking. complete laydown parapet in noted areas. Install mised lateral bracing.
|
BLD19-01362
| BLD-Framing/Rough-in | 9/27/2019 | 9/30/2019 | 9/30/2019 11:58:46 AM | A | PART |
|
|
Kenny Phone #: ###-####. Provide approved fix for cut top chords of floor joist at plumbing penetrations. Complete fire cauliking. complete laydown parapet in noted areas. Install mised lateral bracing.
|
BLD19-01361
| BLD-Framing/Rough-in | 9/27/2019 | 9/30/2019 | 9/30/2019 11:58:26 AM | A | PART |
|
|
Kenny Phone #: ###-####. Provide approved fix for cut top chords of floor joist at plumbing penetrations. Complete fire cauliking. complete laydown parapet in noted areas. Install mised lateral bracing.
|
BLD19-01360
| BLD-Framing/Rough-in | 9/27/2019 | 9/30/2019 | 9/30/2019 11:58:08 AM | A | PART |
|
|
Kenny Phone #: ###-####. Provide approved fix for cut top chords of floor joist at plumbing penetrations. Complete fire cauliking. complete laydown parapet in noted areas. Install mised lateral bracing.
|
BLD19-01359
| BLD-Framing/Rough-in | 9/27/2019 | 9/30/2019 | 9/30/2019 11:57:45 AM | A | PART |
|
|
Kenny Phone #: ###-####. Provide approved fix for cut top chords of floor joist at plumbing penetrations. Complete fire cauliking. complete laydown parapet in noted areas. Install mised lateral bracing.
|
BLD19-01358
| BLD-Framing/Rough-in | 9/27/2019 | 9/30/2019 | 9/30/2019 11:57:20 AM | A | PART |
|
|
Kenny Phone #: ###-####. Provide approved fix for cut top chords of floor joist at plumbing penetrations. Complete fire cauliking. complete laydown parapet in noted areas. Install mised lateral bracing.
|
BLD19-01355
| BLD-Framing/Rough-in | 9/27/2019 | 9/30/2019 | 9/30/2019 11:56:33 AM | A | PART |
|
|
Kenny Phone #: ###-####. Provide approved fix for cut top chords of floor joist at plumbing penetrations. Complete fire cauliking. complete laydown parapet in noted areas. Install mised lateral bracing.
|
BLD19-02660
| BLD-Ceiling Grid Inspection | 9/27/2019 | 9/30/2019 | 9/30/2019 10:25:56 AM | A | PASS |
|
|
Brett Phone #: ###-####
|
BLD19-03165
| BLD-Footing | 9/27/2019 | 9/30/2019 | 9/30/2019 9:50:56 AM | A | PASS |
|
|
glen Phone #: ###-####
|
BLD12-01277
| BLD-Framing/Rough-in | 9/27/2019 | 9/30/2019 | 9/30/2019 9:24:10 AM | A | PASS |
|
|
Steve Phone #: ###-####. OK to insulate.
|
BLD19-00733
| BLD-Wall Bracing | 9/25/2019 | 9/30/2019 | 9/30/2019 8:59:59 AM | A | PASS |
|
|
Jose Phone #: ###-####
|
BLD19-03512
| BLD-Final | 9/27/2019 | 9/30/2019 | 9/30/2019 12:00:00 AM | A | CANC |
|
|
Brittany Phone #: ###-####
|