ESC16-01472
| General Inspection | 9/30/2019 | 9/30/2019 | 10/4/2019 12:33:13 PM | | PEND |
|
|
landscaping and onsite drainage installed.
Temp BMPs in Logan alley still installed. Orange is installed by sewer crew. Need to fix water bar wattles to keep directing water to the retention pond
|
ESC16-01457
| General Inspection | 9/30/2019 | 9/30/2019 | 10/4/2019 12:31:45 PM | | PASS |
|
|
No new activity. Still not complete.
|
ESC17-00155
| Aging Inspection | 9/30/2019 | 9/30/2019 | 9/30/2019 8:24:54 AM | | CANC |
|
|
|
ESC18-00369
| Aging Inspection | 9/30/2019 | 9/30/2019 | 9/30/2019 8:24:05 AM | | DEFR |
|
|
inspected by BLD inspector
|