PLM95-01637
| INSP - Final | 9/3/1996 | 9/4/1996 | 9/4/1996 12:00:00 AM | A | FAIL |
|
|
09/04/96 352 - REINSPECTION thermal expansion required
|
PLM96-02168
| INSP - Final | 8/30/1996 | 9/4/1996 | 9/4/1996 12:00:00 AM | A | PASS |
|
|
09/04/96 352 -
|
PLM96-02588
| INSP - Sewer line | 9/3/1996 | 9/4/1996 | 9/4/1996 12:00:00 AM | A | PASS |
|
|
09/04/96 352 - REINSPECTION sewer line stubed 100' from building water line 2" with sprinkler tee installed
|
PLM96-02601
| INSP - Sewer/Water lines-FINAL | 9/3/1996 | 9/4/1996 | 9/4/1996 12:00:00 AM | A | PASS |
|
|
09/04/96 352 -
|
PLM96-02602
| INSP - Sprinkler & Backflow | 9/3/1996 | 9/4/1996 | 9/4/1996 12:00:00 AM | A | PASS |
|
|
09/04/96 352 -
|
PLM96-02610
| INSP - Sewer and Water lines | 9/4/1996 | 9/4/1996 | 9/4/1996 12:00:00 AM | P | PASS |
|
|
09/04/96 352 -
|
PLM96-02611
| INSP - Plumbing Rough-in | 9/4/1996 | 9/4/1996 | 9/4/1996 12:00:00 AM | P | PASS |
|
|
09/04/96 352 - 3-WC 4-LAV 2-TS 1-SH 1-KS 1-WH 1-WB ground work
|