ELE96-01255
| INSP - Conference | 9/4/1996 | 9/4/1996 | 9/4/1996 12:00:00 AM | | PASS |
|
|
/ / 403 - DISCUSSED CONDUCTOR SIZE FOR SERVICE PANEL FOR LOAD DEMAND..
|
ELE96-02903
| INSP - Ele Rough-In/Perm Svc | 9/4/1996 | 9/4/1996 | 9/4/1996 12:00:00 AM | | PASS |
|
|
/ / 403 - SURVEY LEFT: NEC. 110-3. EXAMINATION, INSTALLATION OF EQUIPTMENT. (RIPPED SHEATHING OF RANGE CABLE)...MB
|
ELE96-02906
| INSP - Ele Rough-In/Perm Svc | 9/4/1996 | 9/4/1996 | 9/4/1996 12:00:00 AM | | PASS |
|
|
/ / 403 - SENT FROM JACK...MB
|
ELE96-01938
| INSP - Final | 9/4/1996 | 9/4/1996 | 9/4/1996 12:00:00 AM | P | PASS |
|
|
09/04/96 403 -
|
ELE96-02080
| INSP - Electrical Rough-In | 9/4/1996 | 9/4/1996 | 9/4/1996 12:00:00 AM | P | PASS |
|
|
09/04/96 403 - WALL ROUGH IN -- AS EARLY AS POSSIBLE
|
ELE95-02344
| INSP - Final | 9/4/1996 | 9/4/1996 | 9/4/1996 12:00:00 AM | P | PASS |
|
|
09/04/96 403 - early pm if possible
|