Inspections for the day of: Thursday, September 4, 1997.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Lightfoot
TitleMEC-STR/MEC INSPECTOR
Phone #794-9463
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC97-02396 INSP - Framing/ Rough-in9/3/19979/4/19979/4/1997 12:00:00 AMAFAIL
09/04/97 337 - REVISE HVAC DUCTWORK AS REQUIRED BY REMODEL 3RD FLOOR N.E CORNER-BLD97-1354-$2,000.OO CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
MEC97-00541 INSP - Gas pressure test9/3/19979/4/19979/4/1997 12:00:00 AMAPASS
09/04/97 337 - REINSPECTION GP -OK GAS PIPING
MEC97-02209 INSP - Retro Fit (check note)9/3/19979/4/19979/4/1997 12:00:00 AMPNH
09/04/97 337 - AFTER 4:00 FURANCE GAS TEST no access
MEC97-02399 INSP - Rough-in & Gas Pressure9/4/19979/4/19979/4/1997 12:00:00 AMPPASS
09/04/97 337 - furn/gas test FNL -OK FINAL ì
MEC97-02403 INSP - Final9/4/19979/4/19979/4/1997 12:00:00 AMPNR
09/04/97 337 - DUCTWORK INSTALLED FOR HOODS-1ST FLOOR-S.SIDE-BLD97-1378- not ready need to install make up air need to permit hood
MEC97-02403 INSP - Final9/4/19979/4/19979/4/1997 12:00:00 AMPNR
09/04/97 337 - DUCTWORK INSTALLED FOR HOODS-1ST FLOOR-S.SIDE-BLD97-1378- not ready need to install make up air need to permit hood