Inspections for the day of: Thursday, September 4, 1997.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorWes Worcester
TitleBLD-COM/RES INSPECTOR
Phone #340-1490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC97-02383 INSP - Rough-in & Gas Pressure9/3/19979/4/19979/4/1997 12:00:00 AMAPASS
BLD95-02112 INSP - Final9/3/19979/4/19979/4/1997 12:00:00 AMAPASS
5296 ENTER THIS IS FOR THE GARAGE
BLD95-02112 INSP - Letter of compliance9/5/19979/4/19979/4/1997 12:00:00 AMAPASS
c/c issued
BLD97-00371 INSP - Final9/4/19979/4/19979/4/1997 12:00:00 AMANR
sign elect not signed off, ceiling grid and hood duct not open
BLD97-01985 INSP - Energy code compliance9/3/19979/4/19979/4/1997 12:00:00 AMAPASS
BLD97-02225 INSP - Footings9/3/19979/4/19979/4/1997 12:00:00 AMAPASS
BLD97-02312 INSP - Framing/Rough-in9/3/19979/4/19979/4/1997 12:00:00 AMPPASS
2:30
BLD97-02337 INSP - Letter of compliance9/4/19979/4/19979/4/1997 12:00:00 AMPPASS
c/c left on premises
BLD97-02374 INSP - Conference9/4/19979/4/19979/4/1997 12:00:00 AMPFAIL
talked to Tim at lenghth about foothills
BLD97-02374 INSP - Foundation9/4/19979/4/19979/4/1997 12:00:00 AMPFAIL
poured w/o insp, engineering required
BLD97-02374 INSP - Conference9/4/19979/4/19979/4/1997 12:00:00 AMPPART
talked to Bob about pour w/o inspection
BLD97-00760 INSP - Framing/Rough-in9/4/19979/4/19979/4/1997 12:00:00 AMPNH
please call ###-#### walte
BLD97-01358 INSP - Framing/Rough-in9/3/19979/4/19979/4/1997 12:00:00 AMPPASS
BLD97-01449 INSP - Energy code compliance9/4/19979/4/19979/4/1997 12:00:00 AMPFAIL
MEC96-01993 INSP - Final9/4/19979/4/19979/4/1997 12:00:00 AMPPASS
MEC96-01993 INSP - Final9/4/19979/4/19979/4/1997 12:00:00 AMPPASS