Inspections for the day of: Tuesday, September 4, 2001.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00463 BLD-Aging Inspection9/4/20019/4/20019/4/2001 12:00:00 AM NR
Parks Dept... no call...restore O'Farrel cabin 9/4/2001 11:01:24 AM
BLD01-01494 BLD-Aging Inspection9/4/20019/4/20019/4/2001 12:00:00 AM NR
roof, no call 9/4/2001 10:57:50 AM
BLD00-03721 BLD-Framing/Rough-in8/31/20019/4/20019/4/2001 12:00:00 AMAPASS
fr insp jack ###-#### batt. smoke dets ok at exist bedrooms. 9/4/2001 11:34:33 AM
BLD01-00531 BLD-Concrete8/31/20019/4/20019/4/2001 12:00:00 AMAPART
scott ###-#### concrete; decks only, ok w/ spec insp. 9/4/2001 9:30:10 AM
BLD01-02210 BLD-Final8/31/20019/4/20019/4/2001 12:00:00 AMAPART
CALL 1ST BEFORE INSP- MIKE ###-#### FN ; elastomeric roof coating...work done w/o insp. 9/4/2001 2:45:13 PM
BLD00-00662 BLD-Final8/31/20019/4/20019/4/2001 12:00:00 AMAPASS
FN OCC- WALT-- ###-####, c/n ok, ok for final, Walt has card ? 9/4/2001 11:45:56 AM
BLD01-00186 BLD-Conference9/4/20019/4/20019/4/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 9/4/2001 11:07:25 AM w/ Dave & proj mgr onsite...need eng's fix for steel burn thru at roof deck welds
BLD00-02375 BLD-Conference9/4/20019/4/20019/4/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 9/4/2001 11:53:49 AM reviewed low strength result on spec insp report...will chk w/Wendall
BLD00-02971 BLD-Conference9/4/20019/4/20019/4/2001 12:00:00 AMPPASS
Added by Inspector: 340 On 9/4/2001 3:51:40 PM w? Rick J. & GS...need consult w/ fire (Sam or Dave M.) re alarms...ok to final w/ agreement per GS.
BLD01-01204 BLD-Conference9/4/20019/4/20019/4/2001 12:00:00 AMPPASS
Added by Inspector: 340 On 9/4/2001 5:24:14 PM left msg w/ contractor
BLD00-01649 BLD-Framing/Rough-in8/30/20019/4/20019/4/2001 12:00:00 AMPFAIL
Scheduled by Inspector: 340 On 8/30/2001 2:12:37 PM walk thru, verbal c/n: need backing studs or listed assy at 2hr stair walls... complete firestops at all penetrations. 9/5/2001 3:43:50 PM
BLD00-03133 BLD-Framing/Rough-in9/4/20019/4/20019/4/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 09/04/2001 at 06:51:24. Contact: . most c/n items ok, unclear about occ. sep...lid or wall?? 9/4/2001 5:15:36 PM
BLD01-00915 BLD-Final9/4/20019/4/20019/4/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 09/04/2001 at 10:05:41. Contact: ###-####. no insp, need fire & elec 1st. spoke w/ Park town const. office 9/4/2001 2:55:44 PM
BLD01-01204 BLD-Foundation9/4/20019/4/20019/4/2001 12:00:00 AMPNR
TIM ###-#### WALL COVER
BLD01-01642 BLD-Framing/Rough-in9/4/20019/4/20019/4/2001 12:00:00 AMPFAIL
re-insp ###-#### -tim fr ; c/n,need plbg permit, complete nailing at shear walls/roof blocking, ( add blocking); verify existing 1hr walls 9/4/2001 3:54:15 PM