Inspections for the day of: Tuesday, September 4, 2001.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorStan Johnson
TitlePLM-INSPECTOR
Phone #340-1257
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM01-03008 Water and/or Sewer8/31/20019/4/20019/4/2001 12:00:00 AMAPASS
###-####
PLM01-02852 Plumbing Rough-in8/31/20019/4/20019/4/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/31/2001 at 17:17:56. Contact: ###-####.
PLM01-02907 Water and/or Sewer9/4/20019/4/20019/4/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/04/2001 at 08:29:13. Contact: ###-####.
PLM01-02897 Water and/or Sewer9/4/20019/4/20019/4/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/04/2001 at 08:30:10. Contact: ###-####.
PLM01-02276 Roof Drains9/4/20019/4/20019/4/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/04/2001 at 08:36:30. Contact: ###-####.roof drains and overflows complete 9/4/2001 10:09:29 AM
PLM01-00083 Plumbing Rough-in9/4/20019/4/20019/4/2001 12:00:00 AMPPASS
kevin ###-####
PLM01-02440 Final9/4/20019/4/20019/4/2001 12:00:00 AMPPASS
fn john ###-#### --on gar door access 1001 or 2525
PLM01-02440 Final9/4/20019/4/20019/4/2001 12:00:00 AMPPASS
fn john ###-#### --on gar door access 1001 or 2525
PLM01-03018 Sprinkler (Final)9/4/20019/4/20019/4/2001 12:00:00 AMPPASS
###-####
PLM01-03018 Sprinkler (Final)9/4/20019/4/20019/4/2001 12:00:00 AMPPASS
###-####
PLM01-01235 Plumbing Rough-in9/4/20019/4/20019/4/2001 12:00:00 AMPPASS
###-#### C J remove offset flanges rough in properly if hdcp. or move back to 16" from wall if not hdcp. will check on final or before 9/4/2001 2:33:42 PM