PLM01-01827
| PLM-Aging Inspection | 9/4/2001 | 9/4/2001 | 9/4/2001 12:00:00 AM | | NR |
|
|
no inspection requested 9/4/2001 10:04:30 AM
|
PLM00-02196
| Sprinkler (Final) | 9/4/2001 | 9/4/2001 | 9/4/2001 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 360 On 9/4/2001 8:43:01 AM need to change black iron union,s to galvanized or brass 9/4/2001 10:00:57 AM
|
PLM01-01418
| Final | 8/31/2001 | 9/4/2001 | 9/4/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 08/31/2001 at 11:38:34. Contact: ###-####. contractor to call when ready 9/4/2001 11:58:12 AM
|
PLM01-03009
| Plumbing Rough-in | 8/31/2001 | 9/4/2001 | 9/4/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM01-02989
| Water and/or Sewer | 8/31/2001 | 9/4/2001 | 9/4/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 360 On 8/31/2001 4:16:23 PM air test on non-potable water to wash room air test a-ok 9/4/2001 11:59:04 AM
|
PLM01-02495
| Plumbing Rough-in | 9/4/2001 | 9/4/2001 | 9/4/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/04/2001 at 08:33:09. Contact: ###-####.
|
PLM01-03016
| Plumbing Rough-in | 9/4/2001 | 9/4/2001 | 9/4/2001 12:00:00 AM | P | NH |
|
|
###-####
|
PLM01-03002
| Sprinkler (Final) | 9/4/2001 | 9/4/2001 | 9/4/2001 12:00:00 AM | P | PASS |
|
|
###-#### REINSPECTION
|
PLM01-03021
| Sprinkler (Final) | 9/4/2001 | 9/4/2001 | 9/4/2001 12:00:00 AM | P | FAIL |
|
|
###-#### need to expose main tie in P.V.B. need,s to be twelve-inches above highest floodable head 9/4/2001 3:23:53 PM
|
PLM01-03024
| Plumbing Rough-in | 9/4/2001 | 9/4/2001 | 9/4/2001 12:00:00 AM | P | PASS |
|
|
###-#### JIM
|
PLM01-03016
| Plumbing Rough-in | 9/4/2001 | 9/4/2001 | 9/4/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 360 On 9/4/2001 3:30:00 PM
|