Inspections for the day of: Wednesday, September 4, 2002.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-02715 Sprinkler (Final)9/3/20029/4/20029/4/2002 12:00:00 AMAFAIL
###-#### final ok 9/4/2002 9:11:17 AM
PLM02-02716 Plumbing Rough-in9/3/20029/4/20029/4/2002 12:00:00 AMAPASS
###-#### george final ok 9/4/2002 11:20:19 AM
PLM02-02119 Final9/3/20029/4/20029/4/2002 12:00:00 AMAPASS
###-#### craig lock box code 139 final ok 9/4/2002 9:36:26 AM
PLM02-02590 Plumbing Rough-in9/3/20029/4/20029/4/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/03/2002 at 15:39:35. Contact: ###-####.
PLM02-01948 Final9/3/20029/4/20029/4/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/03/2002 at 16:01:38. Contact: ###-####. final ok 9/4/2002 9:48:47 AM
PLM02-00906 Plumbing Rough-in9/4/20029/4/20029/4/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 09/04/2002 at 10:28:13. Contact: ###-####. INSPECTION IS OUT AT AIRPORT .. CONCOURSE A NEW RESTROOM water and waste above the floor in the temp restroom in concorce b 9/4/2002 3:30:11 PM
PLM02-02725 Sprinkler (Final)9/4/20029/4/20029/4/2002 12:00:00 AMPDONE
CHAD ###-####
PLM02-02726 Sprinkler (Final)9/4/20029/4/20029/4/2002 12:00:00 AMPPART
jennette ###-####--in basement?? dcva installed on the service but no test tag, boiler has an rp on the make up 9/4/2002 3:31:09 PM
PLM02-02727 Plumbing Rough-in9/4/20029/4/20029/4/2002 12:00:00 AMPPASS
r/i debest ###-#### ri ok 9/4/2002 5:05:21 PM