PLM02-02715
| Sprinkler (Final) | 9/3/2002 | 9/4/2002 | 9/4/2002 12:00:00 AM | A | FAIL |
|
|
###-#### final ok 9/4/2002 9:11:17 AM
|
PLM02-02716
| Plumbing Rough-in | 9/3/2002 | 9/4/2002 | 9/4/2002 12:00:00 AM | A | PASS |
|
|
###-#### george final ok 9/4/2002 11:20:19 AM
|
PLM02-02119
| Final | 9/3/2002 | 9/4/2002 | 9/4/2002 12:00:00 AM | A | PASS |
|
|
###-#### craig lock box code 139 final ok 9/4/2002 9:36:26 AM
|
PLM02-02590
| Plumbing Rough-in | 9/3/2002 | 9/4/2002 | 9/4/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/03/2002 at 15:39:35. Contact: ###-####.
|
PLM02-01948
| Final | 9/3/2002 | 9/4/2002 | 9/4/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/03/2002 at 16:01:38. Contact: ###-####. final ok 9/4/2002 9:48:47 AM
|
PLM02-00906
| Plumbing Rough-in | 9/4/2002 | 9/4/2002 | 9/4/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/04/2002 at 10:28:13. Contact: ###-####. INSPECTION IS OUT AT AIRPORT .. CONCOURSE A NEW RESTROOM water and waste above the floor in the temp restroom in concorce b 9/4/2002 3:30:11 PM
|
PLM02-02725
| Sprinkler (Final) | 9/4/2002 | 9/4/2002 | 9/4/2002 12:00:00 AM | P | DONE |
|
|
CHAD ###-####
|
PLM02-02726
| Sprinkler (Final) | 9/4/2002 | 9/4/2002 | 9/4/2002 12:00:00 AM | P | PART |
|
|
jennette ###-####--in basement?? dcva installed on the service but no test tag, boiler has an rp on the make up 9/4/2002 3:31:09 PM
|
PLM02-02727
| Plumbing Rough-in | 9/4/2002 | 9/4/2002 | 9/4/2002 12:00:00 AM | P | PASS |
|
|
r/i debest ###-#### ri ok 9/4/2002 5:05:21 PM
|