ELE01-03617
| ELE-Aging Inspection | 9/4/2003 | 9/4/2003 | 9/4/2003 12:00:00 AM | | PART |
|
|
WSUC 9/10/2003 2:30:54 PM
|
ELE03-00185
| ELE-Aging Inspection | 9/4/2003 | 9/4/2003 | 9/4/2003 12:00:00 AM | | PART |
|
|
called they call for inspection when ready 9/10/2003 2:30:11 PM
|
ELE03-02472
| Electrical Rough-In | 9/4/2003 | 9/4/2003 | 9/4/2003 12:00:00 AM | A | PART |
|
|
u/g behind north tower
|
ELE03-00067
| Final | 9/3/2003 | 9/4/2003 | 9/4/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 9/3/2003 at 3:12:58 PM. Contact: ###-####. ok 9/4/2003 7:56:24 AM
|
ELE03-02322
| Final | 9/3/2003 | 9/4/2003 | 9/4/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 9/3/2003 at 3:51:03 PM. Contact: ###-####. 210.8(B)(3) gfci for all recepts in kit, old and new, 200.6, or 250.119 shall not ID 6 or smaller, cor. poste for school district work done without permit 9/4/2003 9:38:57 AM
|
ELE03-02430
| Final | 9/3/2003 | 9/4/2003 | 9/4/2003 12:00:00 AM | A | FAIL |
|
|
final inspection; Phone #: ###-#### Internet Inspection Request from: Andy Rose p/s is a mess contractor will set up conference needs main ahead of split bus panel address clearences for p/s and sub panel no violations to be retained called 9/4/2003 10:20:46 AM
|
ELE03-01840
| Electrical Rough-In | 9/3/2003 | 9/4/2003 | 9/4/2003 12:00:00 AM | A | PASS |
|
|
craig elec-call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie called left message 9/4/2003 9:53:08 AM ok 9/4/2003 11:18:05 AM
|
ELE02-02684
| Electrical Rough-In | 9/3/2003 | 9/4/2003 | 9/4/2003 12:00:00 AM | A | PART |
|
|
ernest; Phone #: ###-#### Internet Inspection Request from: Marc Lileks correction for power blinds ok 9/4/2003 8:43:41 AM
|
ELE03-02352
| Final | 9/3/2003 | 9/4/2003 | 9/4/2003 12:00:00 AM | P | FAIL |
|
|
monument sign located on west side of driveway into clinic. Thanks Robin; Phone #: ###-#### Internet Inspection Request from: Susie Seltzer ne3ed access to sign interior called sign company will schedule inspection 9/4/2003 3:53:25 PM
|
ELE03-02717
| Final | 9/3/2003 | 9/4/2003 | 9/4/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 9/3/2003 at 9:13:04 PM. Contact: ###-####. ok 9/4/2003 4:29:47 PM
|
ELE03-01882
| Final | 9/4/2003 | 9/4/2003 | 9/4/2003 12:00:00 AM | P | PASS |
|
|
al; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok 9/4/2003 2:05:20 PM
|
ELE03-01881
| Final | 9/4/2003 | 9/4/2003 | 9/4/2003 12:00:00 AM | P | PASS |
|
|
al; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok 9/4/2003 2:05:15 PM
|
ELE03-02730
| Conference | 9/4/2003 | 9/4/2003 | 9/4/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 9/4/2003 at 10:00:05 AM. Contact: ###-####. needs bushings for rigid nipple and chase nipple at nsign pole bell box 9/4/2003 2:59:33 PM
|
ELE03-02741
| Rough-In Permanent Service | 9/4/2003 | 9/4/2003 | 9/4/2003 12:00:00 AM | P | PART |
|
|
rick; Phone #: ###-#### Internet Inspection Request from: Darla Downs r/i for new basement bath ok needs clearence for sub panel 110.26(F)(1) there is no p/s 9/4/2003 12:58:24 PM
|
ELE03-02681
| Final | 9/4/2003 | 9/4/2003 | 9/4/2003 12:00:00 AM | P | NH |
|
|
Scheduled by a contractor via Hello! on 9/4/2003 at 11:20:19 AM. Contact: ###-####. called no access
9/4/2003 2:58:12 PM
|
ELE03-02755
| Electrical Rough-In | 9/4/2003 | 9/4/2003 | 9/4/2003 12:00:00 AM | P | FAIL |
|
|
called covered be inspection, 300.5 u/g not deep enough, needs approved jbox called
|
ELE03-01573
| Final | 9/4/2003 | 9/4/2003 | 9/4/2003 12:00:00 AM | P | PASS |
|
|
ok
|