Inspections for the day of: Tuesday, September 4, 2007.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00441 INSP-Final Inspection8/31/20079/4/20079/4/2007 4:41:43 PMANR
sandy; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt
FIR07-00664 INSP-Alarm Testing8/31/20079/4/20079/4/2007 4:39:50 PMAFAIL
The SD at the new control panel is too close to an HVAC supply register, one duct detector has the sample tube installed backward, need to locate the inspectors test valve to enable testing of the sprinkler flow switch, the existing FACP if no longer in service shall be removed to prevent confusion, need to verify signals at the supervising station.
FIR07-00304 INSP-Sprinkler Rough-in9/4/20079/4/20079/4/2007 3:00:36 PMPDEFR
Inspection rescheduled for 9/5 as discussed.
BLD06-01188 FIRE-Conference8/29/20079/4/20079/4/2007 2:42:39 PMADONE
Discussion regarding atrium smoke evac testing and stairwell pressure test.
BLD07-00959 FIRE-Final Inspection8/31/20079/4/20079/4/2007 2:28:58 PMPNR
Pending project related fire sprinkler permit final.
FIR07-00437 INSP-Sprinkler Rough-in9/4/20079/4/20079/4/2007 2:16:49 PMPPART
Circled areas on stamped plan set okayed for cover, noted one overspaced head at the corridor, remainder of the scope of work is not complete.
BLD07-00297 FIRE-Final Inspection8/31/20079/4/20079/4/2007 2:14:02 PMAPASS
Fire life safety passed field inspection.
FIR07-00220 INSP-Final Inspection9/4/20079/4/20079/4/2007 2:12:52 PMPPASS
Final fire sprinkler inspection passed, permit finaled.
FIR07-00015 INSP-Alarm Testing8/30/20079/4/20079/4/2007 2:11:02 PMAPART
See approved plans for areas tested today, noted some floor plan modifications affecting alarm work, need to add devices as noted, addressing has changed at some locations and is recorded on as-builts.
FIR07-00204 INSP-Sprinkler Rough-in/Hydro8/31/20079/4/20079/4/2007 2:06:55 PMAPART
Hydrostatic testing for the first and second floors passed, the third floor hydro failed due to pressure loss at the guage.
FIR07-00147 FIR-Aging Inspection9/4/20079/4/20079/4/2007 10:39:11 AM DEFR
Work in progress.
BLD07-01644 FIRE-Final Inspection8/31/20079/4/20079/4/2007 10:34:26 AMAPASS
Fire life safety finaled.
FIR07-00015 INSP-Alarm Testing8/30/20079/4/20078/30/2007 11:59:03 AMACANC
Forrest,
This is a confirmation of rescheduling a partial inspection of in-patient pharmacy at St. Luke''s Hospital from today to next Tuesday, 9-4-07 due to inspection backlog. Please call for time.
Thanks,
Jim Phone #: ###-#### Internet Inspection Request from: James Shilton Inspection cancelled from web by: James Shilton