ELE08-02444
| Rough-In Permanent Service | 9/4/2008 | 9/4/2008 | 9/4/2008 4:12:19 PM | P | CANC |
|
|
#90746,Q#8231AVP. ADDED 1 NEW DUPLEX RECEPTACLE TO THE EXISTING ONES INSIDE THE EXISTING PHONE CABINET. BRIAN ###-####. Phone #: ###-#### Internet Inspection Request from: Dan Mitchell see ri and final, wrong type request, no esc this project
|
ELE08-02444
| Final | 9/4/2008 | 9/4/2008 | 9/4/2008 3:44:09 PM | P | PASS |
|
|
#90746,Q#8231AVP. ADDED 1 NEW DUPLEX RECEPTACLE TO THE EXISTING ONES INSIDE THE EXISTING PHONE CABINET. BRIAN ###-####. Phone #: ###-#### Internet Inspection Request from: Dan Mitchell ok to final, no esc this project
|
ELE08-02444
| Electrical Rough-In | 9/4/2008 | 9/4/2008 | 9/4/2008 3:19:29 PM | P | PASS |
|
|
#90746,Q#8231AVP. ADDED 1 NEW DUPLEX RECEPTACLE TO THE EXISTING ONES INSIDE THE EXISTING PHONE CABINET. BRIAN ###-####. Phone #: ###-#### Internet Inspection Request from: Dan Mitchell ri ok, no esc this project
|
ESC08-00263
| General Inspection | 9/4/2008 | 9/4/2008 | 9/4/2008 3:16:45 PM | P | PART |
|
|
looked ok
|
ESC08-00483
| General Inspection | 9/4/2008 | 9/4/2008 | 9/4/2008 3:15:58 PM | P | PART |
|
|
looked ok
|
ESC08-00648
| General Inspection | 9/4/2008 | 9/4/2008 | 9/4/2008 3:15:04 PM | P | PART |
|
|
looked ok
|
ESC08-00238
| General Inspection | 9/4/2008 | 9/4/2008 | 9/4/2008 3:14:14 PM | A | PART |
|
|
looked ok
|
ESC06-01387
| General Inspection | 9/4/2008 | 9/4/2008 | 9/4/2008 3:13:11 PM | A | PART |
|
|
looked ok
|
ELE08-02379
| Final | 9/4/2008 | 9/4/2008 | 9/4/2008 3:12:02 PM | P | PASS |
|
|
ok to final, no esc this project
|
ELE08-02283
| Final | 9/4/2008 | 9/4/2008 | 9/4/2008 3:11:05 PM | P | PASS |
|
|
ok to final, no esc this project
|
ELE08-02249
| Final | 9/4/2008 | 9/4/2008 | 9/4/2008 3:09:54 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Roy Kay ok to final, met contractor, no esc this project
|
ELE08-02450
| Temporary Service | 9/4/2008 | 9/4/2008 | 9/4/2008 2:39:30 PM | P | PASS |
|
|
Overhead temp pole located in back of lot next to alley. Enter through gate on south side Phone #: ###-#### Internet Inspection Request from: Joe Thomas t/s o/h n ok, no esc this project
|
ELE08-02358
| Electrical Rough-In | 9/4/2008 | 9/4/2008 | 9/4/2008 2:02:39 PM | P | PASS |
|
|
Hi Pat, This is the remodel I met you at, its on the second floor of the building. I need the new wall inspected at the conference room, the conference room is on the right side of the secretary''s desk when you get off the elevator. Give me a call if you have any problems locating it. Thx. Wayne Phone #: ###-#### Internet Inspection Request from: Wayne Craig ric ok wall only to right of secretary, 2nd floor only, for conference room, no esc this project
|
ELE08-02141
| Rough-In Permanent Service | 9/4/2008 | 9/4/2008 | 9/4/2008 1:19:27 PM | P | PASS |
|
|
Alan Phone #: ###-#### ric ok, p's u'g n ok
|
ELE08-02431
| Final | 9/4/2008 | 9/4/2008 | 9/4/2008 12:27:34 PM | P | PASS |
|
|
ok to final
|
ELE08-02431
| Permanent Service | 9/2/2008 | 9/4/2008 | 9/4/2008 12:24:58 PM | P | PASS |
|
|
larse Phone #: ###-#### p/s u/g rec ok (was o/h)
|
ELE08-02323
| Final | 9/4/2008 | 9/4/2008 | 9/4/2008 10:37:26 AM | P | FAIL |
|
|
Hi Bob, This is the coffee roasting job site. Please indicate on the red tag that the coffee roasting equipment needs to be UL listed as a complete unit. Thx. Wayne Phone #: ###-#### Internet Inspection Request from: Wayne Craig left correction notice BCC 4-05-33(A)&(B) and NEC 110.3(B) equipment shall be listed by a nationally recognized testing laboratory and installed per instructions-this equipment shall be listed as an assembly by field evaluation
|
ELE08-01773
| Rough-In Permanent Service | 9/3/2008 | 9/4/2008 | 9/4/2008 10:28:17 AM | A | FAIL |
|
|
John- call 30 min prior to going Phone #: ###-#### met owner, BCC all make-up shall be done for receptacles in shop, service conductors shall be 4/0 aluminum, not 1/0 in riser, will correct and recall
|
ELE08-02211
| Temporary Service | 9/3/2008 | 9/4/2008 | 9/4/2008 9:44:06 AM | A | CANC |
|
|
dale Phone #: ###-#### wrong type request, see ri no esc this project
|
ELE08-02211
| Electrical Rough-In | 9/4/2008 | 9/4/2008 | 9/4/2008 9:13:11 AM | A | PASS |
|
|
dale Phone #: ###-#### ok to cover u/g for south end parking lot for planters and at transformer for ipco, no esc this project
|
ELE07-04131
| Final | 9/3/2008 | 9/4/2008 | 9/4/2008 9:04:36 AM | A | PASS |
|
|
Final for project Phone #: ###-#### Internet Inspection Request from: Spencer Mclean corrections made, ok to final, signed occupancy card
|
ELE08-02433
| Electrical Rough-In | 9/3/2008 | 9/4/2008 | 9/4/2008 8:37:02 AM | A | PASS |
|
|
Brian Phone #: ###-#### walls and soffit only ok to cover, no esc this project
|
ELE08-02440
| Permanent Service | 9/3/2008 | 9/4/2008 | 9/4/2008 8:04:21 AM | A | PASS |
|
|
#90739,Q#8231AWP. Wired a new power pedestal & phone cabinet for QWEST. Brian ###-####. Phone #: ###-#### Internet Inspection Request from: Dan Mitchell p/s u/g n ok, no esc this project
|
ELE08-02440
| Final | 9/4/2008 | 9/4/2008 | 9/4/2008 8:04:09 AM | A | PASS |
|
|