PLM08-02106
| Water Heater Final | 8/29/2008 | 9/4/2008 | 9/4/2008 4:14:18 PM | P | CANC |
|
|
please call ramone to meet at ###-####. thanks! Phone #: ###-#### Internet Inspection Request from: Kelea Dunne
|
PLM08-00963
| Final | 9/3/2008 | 9/4/2008 | 9/4/2008 3:50:35 PM | A | PART |
|
|
backflow devices need tested & certified.
|
PLM08-02137
| Water and/or Sewer | 9/3/2008 | 9/4/2008 | 9/4/2008 3:19:22 PM | P | PASS |
|
|
PVB FROM EXISTING SYSTEM IN BACKYARD WAS MOVED TO FRONT WITH A NEW MAIN AND DRAIN TAP. Phone #: ###-#### Internet Inspection Request from: Fritz J. Houser
|
PLM08-02137
| DOC - Permit Finaled | 9/4/2008 | 9/4/2008 | 9/4/2008 3:19:08 PM | P | PASS |
|
|
PVB FROM EXISTING SYSTEM IN BACKYARD WAS MOVED TO FRONT WITH A NEW MAIN AND DRAIN TAP. Phone #: ###-#### Internet Inspection Request from: Fritz J. Houser
|
PLM08-02143
| Water and/or Sewer | 9/4/2008 | 9/4/2008 | 9/4/2008 3:01:10 PM | P | PART |
|
|
wyatt Phone #: ###-####-blowout tee needs to be downstream of dbca & #1 ballvalve is on the downstream side. ok to cover.
|
PLM08-02075
| Storm Drains | 9/4/2008 | 9/4/2008 | 9/4/2008 2:42:19 PM | P | PART |
|
|
two laterals ok to cover, marked on plans. still needs tested.
|
PLM08-02134
| Water and/or Sewer | 9/4/2008 | 9/4/2008 | 9/4/2008 1:42:57 PM | P | PART |
|
|
sewer tap & sewer stub into building pass.
|
PLM08-02075
| Storm Drains | 9/4/2008 | 9/4/2008 | 9/4/2008 12:14:41 PM | P | CANC |
|
|
|
PLM08-02134
| Other | 9/3/2008 | 9/4/2008 | 9/4/2008 11:38:48 AM | A | DONE |
|
|
10:30 am-this was a conferance with bill thomson on work done without permits-buss mec needs to pull permit & change out dbca to a rpba, drain pro needs to pull a permit & change out pvc inside building to approved material.this is a duel system for irrigation. spoke with both contractors & they will comply.
|
PLM08-02136
| Water and/or Sewer | 9/3/2008 | 9/4/2008 | 9/4/2008 11:34:08 AM | A | PASS |
|
|
William Phone #: ###-####
|
PLM08-02136
| DOC - Permit Finaled | 9/4/2008 | 9/4/2008 | 9/4/2008 11:33:54 AM | P | PASS |
|
|
William Phone #: ###-####
|
PLM08-01801
| Final | 9/3/2008 | 9/4/2008 | 9/4/2008 9:43:44 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 9/3/2008 at 1:39:38 PM. Contact: ###-####.
|
PLM08-02131
| Plumbing Rough-in | 9/3/2008 | 9/4/2008 | 9/4/2008 8:45:17 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Erin Whiting
|
ESC08-00402
| General Inspection | 9/4/2008 | 9/4/2008 | 9/4/2008 8:44:50 AM | A | PART |
|
|
site looks ok, small amount of trash on site.
|