GCE09-00005
| GCE-Rough-In | 9/4/2009 | 9/4/2009 | 9/4/2009 2:25:44 PM | P | PASS |
|
|
zack Phone #: ###-####. ok to cover.
|
ELE09-01667
| Electrical Rough-In | 9/4/2009 | 9/4/2009 | 9/4/2009 1:46:34 PM | P | PASS |
|
|
Darren Phone #: ###-####. NEC 300.4 A1 Protection from physical damage. Called Darren and left survey at site.
|
ELE09-01401
| Final | 9/4/2009 | 9/4/2009 | 9/4/2009 12:52:45 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Stan Woodward. Ok final.
|
ELE09-01379
| Final | 9/3/2009 | 9/4/2009 | 9/4/2009 11:47:45 AM | A | PASS |
|
|
Bill Phone #: ###-####. Ok final.
|
ELE09-01437
| Permanent Service | 9/3/2009 | 9/4/2009 | 9/4/2009 10:02:19 AM | A | PART |
|
|
alan Phone #: ###-####. P/S U/G Reconnect ok.
|
ELE09-01664
| Electrical Rough-In | 9/3/2009 | 9/4/2009 | 9/4/2009 9:40:19 AM | A | PASS |
|
|
Bill Phone #: ###-####. Ok to cover.
|
ELE09-01409
| Electrical Rough-In | 9/3/2009 | 9/4/2009 | 9/4/2009 9:13:52 AM | A | PART |
|
|
Please provide underground inspection. Phone #: ###-#### Internet Inspection Request from: Spencer Mclean. Ok to cover underground.
|