Inspections for the day of: Friday, September 4, 2009.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-01309 BLD-Framing/Rough-in9/4/20099/4/20099/4/2009 4:19:13 PMPFAIL
matt Phone #: ###-####. Needs to ressubmit plan to plan reveiw showing additional work that was added. Also needs to attach 5/8 type x rock to steel studs as shown on approved plan for the 1hr wall assembly.
BLD07-02208 BLD-Energy code compliance9/4/20099/4/20099/4/2009 4:17:42 PMPPASS
Scheduled by a contractor via Hello! on 9/4/2009 at 11:23:07 AM. Contact: ###-####.
BLD07-02196 BLD-Final9/4/20099/4/20099/4/2009 4:17:31 PMPPART
ray Phone #: ###-####. OK for temp occ. Will be ok for perm occ. once zoning has finaled.
BLD07-02202 BLD-Energy code compliance9/4/20099/4/20099/4/2009 4:17:02 PMPPASS
Scheduled by a contractor via Hello! on 9/4/2009 at 11:21:35 AM. Contact: ###-####.
BLD07-02189 BLD-Final9/4/20099/4/20099/4/2009 4:16:50 PMPPART
ray Phone #: ###-####ok for temp occ. Will be ok for perm oc once zoning has finaled.
ESC07-01076 Site Final9/4/20099/4/20099/4/2009 1:42:39 PMPPASS
Fianl stabalization has been completed.
ESC07-01068 Site Final9/4/20099/4/20099/4/2009 1:40:14 PMPPASS
Final stabalization has been completed.
ESC09-00141 Site Preparation9/4/20099/4/20099/4/2009 1:38:22 PM NR
ESC09-00142 Site Preparation9/4/20099/4/20099/4/2009 1:37:49 PM NR
ESC09-00086 Random Inspection9/4/20099/4/20099/4/2009 1:30:58 PMPPART
Needs to post ESC sign. Construction enterance and all other BMP's are being maintained.
BLD09-00244 BLD-Footing9/4/20099/4/20099/4/2009 1:30:09 PMPDONE
interior footing and slab inspection//Corey Jacobsen ###-#### (ok to schedule insp. per DRS and 450). Structural plans still being reviewed for approval. Inspected interior footings and interior column pad footings for areas 1,2,3,4 and 5. Work done was in compliance with structural plans that were provided by Corey with CCI. It was made to very clear to Corey with CCI that if there are any discrepencies with in place work and final approved structural plans, that CCI is accepting all liability and will be required to make all repairs to bring structural portion into compliance. OK to do inspection per Bruce C. and Jason Blais.
BLD09-01272 BLD-Final9/3/20099/4/20099/4/2009 12:03:15 PMANR
fred Phone #: ###-####. Fire failed.
BLD09-01354 BLD-Final9/3/20099/4/20099/4/2009 8:50:57 AMAPASS
Adam ###-####
BLD09-01354 DOC - Permit Finaled9/4/20099/4/20099/4/2009 8:50:49 AMPPASS