FIR13-00268
| INSP-Alarm Testing | 8/29/2013 | 9/4/2013 | 9/5/2013 8:09:41 AM | P | PART |
|
|
Completed remainder of functional testing including occupant notification, EOL, descriptors for the second floor initiating devices, ADA room coverage. One HS repaired while on site. Final pending points map to be posted at the panel per agreement.
|
BLD13-00835
| FIRE-Final Inspection | 9/4/2013 | 9/4/2013 | 9/5/2013 7:55:44 AM | P | FAIL |
|
|
C/N items include; repair non-functional exit signs and EM lights, post max. occupant load signage, provide access to the locked office room for inspection, replace missing ceiling tile and access panel at the janitors closet, post K class PFE as discussed.
|
FIR13-00310
| INSP-Sprinkler Rough-in | 9/4/2013 | 9/4/2013 | 9/5/2013 7:53:27 AM | P | PART |
|
|
Overhead work at the remodel area per the permit scope is okay to cover.
|
BLD13-00981
| FIRE-Final Inspection | 9/4/2013 | 9/4/2013 | 9/5/2013 7:52:11 AM | A | PASS |
|
|
Fire life safety inspection passed.
|
BLD13-02302
| FIRE-Conference | 9/3/2013 | 9/4/2013 | 9/4/2013 12:45:43 PM | A | DONE |
|
|
On site meeting with tenant regarding conditions for occupancy including fire extinguishers, door hardware, premise identification, hood suppression, permit review comments, etc.
|
BLD13-00679
| FIRE-Final Inspection | 9/3/2013 | 9/4/2013 | 9/4/2013 11:38:16 AM | A | FAIL |
|
|
Repair two exit signs at the north and NE main entry/exit doors, remove one non-required exit sign at the warehouse/storage room door, provide lever action hardware at the restroom door, provide current certification for the fire extinguisher, secure wall plate at the breakroom.
|