FIR13-00545
| INSP-Final Inspection | 9/4/2014 | 9/4/2014 | 9/5/2014 10:04:32 AM | P | FAIL |
|
|
Completed initial project walkthrough. Items noted include; a plan modification will be required due to deletion of elevator recall functions (SD's and HD's), floor plan changes, addition of two MP stations, and changes in notification circuts. Need to provide missing coverage at conference rooms and common areas, post sign at the door to the FACP room, cd settings need adjusted at some locations, spacing and coverage need modified as noted. Plans to match field installation. Provide confirmation from the state elevator division regarding elevator recall.
|
FIR14-00366
| INSP-Sprinkler Rough-in | 9/4/2014 | 9/4/2014 | 9/5/2014 9:46:55 AM | P | PART |
|
|
Inspection for tenting completed okay after adjustments made while on site at one area 1st floor and 4 locations 2nd floor.
|
BLD14-00509
| FIRE-Final Inspection | 9/4/2014 | 9/4/2014 | 9/4/2014 3:14:08 PM | P | PASS |
|
|
|
FIR14-00366
| INSP-Sprinkler Rough-in/Hydro | 9/3/2014 | 9/4/2014 | 9/4/2014 3:12:10 PM | A | PART |
|
|
UG fire supply line flush completed satisfactory.
|
BLD14-01708
| FIRE-Final Inspection | 9/4/2014 | 9/4/2014 | 9/4/2014 1:38:10 PM | P | PASS |
|
|
Life safety inspection passed. *Note- no signature card available on site.
|
FIR14-00527
| INSP-Sprinkler Rough-in | 9/3/2014 | 9/4/2014 | 9/4/2014 1:36:58 PM | A | PART |
|
|
Upright protection at the shell open area and mens restroom okayed for cover. Need to provide coverage at the south hall and east corner of the womens restroom as noted. Pendents at the mens RR also approved.
|
FIR14-00633
| INSP-Sprinkler Rough-in | 9/3/2014 | 9/4/2014 | 9/4/2014 11:47:00 AM | A | PART |
|
|
Okay to cover overhead work at the remodel area sheetrock ceilings.
|
BLD13-03428
| FIRE-Final Inspection | 9/3/2014 | 9/4/2014 | 9/4/2014 11:25:39 AM | A | PASS |
|
|
Life safety inspection passed.
|
FIR14-00345
| INSP-Final Inspection | 9/3/2014 | 9/4/2014 | 9/4/2014 11:03:47 AM | A | PASS |
|
|
Final walkthrough completed. Fire sprinkler permit finaled.
|
BLD13-01792
| FIRE-Final Inspection | 9/3/2014 | 9/4/2014 | 9/4/2014 11:01:57 AM | A | PART |
|
|
EM light and exit sign repairs completed per contractor.
|
BLD13-01810
| FIRE-Final Inspection | 9/3/2014 | 9/4/2014 | 9/4/2014 11:00:35 AM | A | PASS |
|
|
Project already complete - Rodney Phone #: ###-####
|
FIR14-00594
| INSP-Sprinkler Rough-in | 9/3/2014 | 9/4/2014 | 9/4/2014 10:46:29 AM | A | PART |
|
|
Overhead fire sprinkler modifications at the conference room are approved for ceiling cover.
|
BLD13-00689
| FIRE-Final Inspection | 9/3/2014 | 9/4/2014 | 9/4/2014 10:26:27 AM | A | NR |
|
|
Fire life safety final pending project related FIR13-00308.
|
BLD14-02000
| FIRE-Final Inspection | 9/3/2014 | 9/4/2014 | 9/4/2014 10:24:25 AM | A | PASS |
|
|
Noted correction items completed. Fire life safety passed.
|
FIR14-00600
| INSP-Sprinkler Rough-in | 9/3/2014 | 9/4/2014 | 9/4/2014 10:22:48 AM | A | PART |
|
|
Verified plan modification. Remainder of overhead work approved for cover.
|